Collision with terrain involving a Cessna Aircraft Company 172H, VH-KWT, Near ANDADO STN 20WSW, NT on 11 July 1978

Summary

ACFT ON RETURN FLIGHT TO ANDADO,STRUCK AREA OF OPEN FLAT TERRAIN SLIGHT NOSE DOWN ABOUT WINGS LEVELATTITUDE.PILOT RESCUED BUT DIED 2 DAYS LATER OF CARDIAC ARREST.HAD HEART PROBLEMS.NO RECOLLECTIONS.

Occurrence summary

Investigation number 197804051
Occurrence date 11/07/1978
State Northern Territory
Report status Final
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Aviation
Aviation occurrence category Collision with terrain
Occurrence class Accident
Highest injury level Serious

Aircraft details

Manufacturer Cessna Aircraft Company
Model 172H
Registration VH-KWT
Sector Piston
Departure point FINKE
Destination ANDADO
Damage Destroyed

Miscellaneous - Other involving a Cessna Aircraft Company 182L, VH-DSJ, near Cape Otway (HLS), VIC on 21 October 1978

Summary

PLT REPORTED UFO THEN ROUGH RUNNING ENG.TX CEASED-ACFT MISSING.

Occurrence summary

Investigation number 197802563
Occurrence date 21/10/1978
State Victoria
Report status Final
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Aviation
Aviation occurrence category Miscellaneous - Other
Occurrence class Accident
Highest injury level Fatal

Aircraft details

Manufacturer Cessna Aircraft Company
Model 182L
Registration VH-DSJ
Sector Piston
Departure point MOORABBIN VIC
Destination KING ISLAND TAS
Damage Destroyed

Collision with terrain involving a Piper Aircraft Corp PA-32RT-300, VH-CGL, Near PT AUGUSTA 11S, SA on 12 May 1978

Summary

PLT CONTINUED FLT INTO WX IN WHICH HE WAS UNABLE TO MAINTAIN VIZ REFERENCE REQUIRED FOR HIM TO RETAIN CONTROL OF ACFT-ACFT IMPACTED GRND AT HIGH SPEED CONSISTENT WITH SPIRAL DIVE + CARTWHEELED 95M.

Occurrence summary

Investigation number 197804044
Occurrence date 12/05/1978
State South Australia
Report status Final
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Aviation
Aviation occurrence category Collision with terrain
Occurrence class Accident
Highest injury level Fatal

Aircraft details

Manufacturer Piper Aircraft Corp
Model PA-32RT-300
Registration VH-CGL
Sector Piston
Departure point WOOMERA SA
Destination PORT PIRIE SA
Damage Destroyed

Collision with terrain involving a de Havilland Canada DHC-2, VH-AWI, at Hardy Lagoon ALA, Queensland, on 25 June 2015

Final report

What happened

On 25 June 2015, at about 1111 Eastern Standard Time (EST), a de Havilland Canada DHC-2 amphibian[1] aircraft, registered VH-AWI (AWI), taxied at Hardy Lagoon aircraft landing area (ALA), Queensland, for a flight to Shute Harbour with the pilot and seven passengers on board.

The Hardy Lagoon ALA had marker buoys to identify the location of the bommies[2] that were near each of the four take-off and landing areas. The main take-off run (orange run) to the south, started at buoy A, and continued onto buoys B, C, D, E, F (Figure 1, orange line). The take-off run to the east-south-east (yellow run), started at buoy B, and continued onto buoys Q, P, O, N, K (Figure 1, yellow line). As per company policy, the pilot elected to start the take-off at buoy A on the orange run and then turn onto the yellow run. This combination of take-off runs allowed the pilot the maximum take-off distance, for the aircraft’s take-off weight.

Figure 1: Hardy lagoon aircraft landing area.

rid22-picture-3.png

Source: Aircraft operator, modified by the ATSB

The pilot taxied AWI to buoy A and lined up on the orange run. They then advanced the throttle slowly to commence the take-off. As AWI approached buoy B the engine was not at full power. The pilot commenced the turn onto the yellow run utilising the water rudders,[3] which were in the down position. Coming out of the turn the pilot retracted the water rudders and applied right rudder to stop the turn and line up on the yellow run.

The pilot looked inside the cockpit to check the engine instrumentation and to see if the engine had reached full power. At this stage, the aircraft had not risen onto the step[4] (Figure 2). When the pilot looked outside again, they noticed that the nose of the aircraft had drifted too far to the left. The nose had lined up on the left side of the buoy Q, which marked the location of the Q bommie. The pilot attempted to apply more right rudder, but had already applied full right rudder. AWI then hit and passed over the Q coral reef bommie and the pilot closed the engine throttle. AWI continued moving forward and the pilot shut down the engine and lowered the flaps to help slow the aircraft. The left front float slid onto the P bommie and the aircraft came to a stop.

The pilot exited the aircraft and pushed the aircraft off the bommie, before re-entering the cockpit. When AWI had drifted far enough away from the bommie, the pilot restarted the engine and taxied the aircraft to a nearby moored boat, where the passengers disembarked.

The pilot and seven passengers were uninjured and the aircraft sustained minor damage (Figure 3).

Figure 2: AWI conducting a water take-off (not the occurrence take-off). Note the high nose attitude, skids sitting up out of the water as the aircraft is ploughing through the water. AWI has not gained enough speed in the take-off to reach the step, where the nose would be lower and the aircraft would glide along the water on the floats.

rid23-picture-3.png

Source: Aircraft operator, modified by the ATSB

Figure 3: Damage to AWI floats included two holes on the bottom side of each float compartment immediately forward of the wheel well.

rid24-picture-2.png

Source: Aircraft operator

Attempt to reposition the aircraft

After consultation with the chief pilot, who was also at Hardy Lagoon, the pilot attempted a second take-off on the orange run, without any passengers on board. The pilot aborted the take-off at about buoy E, as the aircraft would normally be on the step at this point. The pilot taxied back to the moored boat, shut the aircraft down, and then pumped out water from the compartments in the floats (Figure 4). They then attempted another take-off on the orange run, again without success.

Figure 4: Example cross-section view of the float compartments. Note the bilge pump openings to remove water from the float compartments during the pre-flight inspection, the retractable water rudder used for directional control while taxiing and the location of the wheel well for the retractable main landing gear.

rid25-picture-2.png

Source: Federal Aviation Administration, modified by the ATSB

Pilot comment

The pilot decided to use a combination of the orange and yellow run to give the maximum take-off distance. The pilot indicated that they did this because the aircraft was close to the maximum take-off weight and it was approaching low tide, so the coral reef bommies were more exposed.

The pilot reported a gentle breeze of about 8 kt from south-east and the water was smooth with small ripples. The wind direction was between the orange and yellow runs.

The pilot indicated that they did not advance the throttle as quickly as they would normally, due to a recent conversation with other another company pilot. The conversation was about managing the aircraft engine to ensure that the engine limits were not exceeded. In retrospect, the pilot thought that for the occurrence flight, the advancement of the throttle was too slow. Normally turning onto the yellow run the engine would be at full power.

Pilot experience

The pilot had a total time of about 904 hours, with 540 hours on the DHC-2 aircraft. Of their total time about 595 hours was on seaplanes, with 941 water landings and take-offs. The pilot had 34 landings at the Hardy Lagoon ALA, including 21 solo landings, and 13 under supervision. The pilot had last landed at the Hardy Lagoon ALA 32 days prior to the occurrence.

Operator comment

In light winds, where the pilot wanted additional take-off length, it was standard company procedure to start the take-off on the orange run and then to turn onto the yellow run. The aircraft had a payload of 440 kg, 10 kg under the company limit weight for the aircraft for take- off.

The chief pilot reported that the pilot had pumped out all the water from the floats prior to taxi on the occurrence flight.

Safety action

Whether or not the ATSB identifies safety issues in the course of an investigation, relevant organisations may proactively initiate safety action in order to reduce their safety risk. The ATSB has been advised of the following proactive safety action in response to this occurrence.

Aircraft operator

As a result of this occurrence, the aircraft operator has advised the ATSB that all company pilots will be made aware of the serious incident and conduct recurrent training on the Hardy Lagoon ALA.

Safety message

This serious incident illustrates that distractions can have a significant impact on flight safety. Distraction is a process, condition, or activity that takes a pilot’s attention away from the task of flying. Even a momentary deflection of attention away from the primary task can have adverse consequences.

The Federal Aviation Administration published a handbook Seaplane, skiplane, and float/ski equipped helicopter operations handbook, for pilots and is available from the FAA website. The handbook discuss the importance of the pilot planning an effective course of action, and mentally staying ahead of the seaplane.

The serious incident highlights the importance of pre-flight decision making and planning for emergencies and abnormal situations for the particular aerodrome. A thorough pre-flight self-brief covering the different emergency scenarios may help to minimise safety critical decisions during a high workload situation such as a take-off.

Aviation Short Investigations Bulletin - Issue 47

Purpose of safety investigations

The objective of a safety investigation is to enhance transport safety. This is done through:

  • identifying safety issues and facilitating safety action to address those issues
  • providing information about occurrences and their associated safety factors to facilitate learning within the transport industry.

It is not a function of the ATSB to apportion blame or provide a means for determining liability. At the same time, an investigation report must include factual material of sufficient weight to support the analysis and findings. At all times the ATSB endeavours to balance the use of material that could imply adverse comment with the need to properly explain what happened, and why, in a fair and unbiased manner. The ATSB does not investigate for the purpose of taking administrative, regulatory or criminal action.

Terminology

An explanation of terminology used in ATSB investigation reports is available here. This includes terms such as occurrence, contributing factor, other factor that increased risk, and safety issue.

Publishing information 

Released in accordance with section 25 of the Transport Safety Investigation Act 2003

Published by: Australian Transport Safety Bureau

© Commonwealth of Australia 2016

image_5.png

Ownership of intellectual property rights in this publication

Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this report publication is owned by the Commonwealth of Australia.

Creative Commons licence

With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence.

Creative Commons Attribution 3.0 Australia Licence is a standard form licence agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work.

The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you wish to use their material, you will need to contact them directly.

__________

  1. An aircraft with floats to land on water and retractable wheel-type landing gear that can be extended to allow landing on land. The floats are part of the aircraft landing gear that provide the buoyancy to keep the aircraft afloat
  2. Bommie is a slang name for bombora, an Australian term for an area of large sea waves breaking over a shallow area such as a submerged rock shelf, reef, or sand bank that is located some distance from the shoreline and beach surf break.
  3. Water rudders are retractable control surfaces on the back of each float that can be extended downward into the water to provide directional control when taxiing on the surface. They are attached by cables and springs to the air rudder and operated by the rudder pedals in the cockpit.
  4. The step position is the attitude of the aircraft when the entire weight of the aircraft is supported by hydrodynamic and aerodynamic lift, as it is during high-speed taxi or just prior to take off. This position produces the least amount of water drag. The step is also called the planing position.

Occurrence summary

Investigation number AO-2015-069
Occurrence date 25/06/2015
Location Hardy Lagoon ALA, near Shute Harbour
State Queensland
Report release date 13/04/2016
Report status Final
Investigation level Short
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Aviation
Aviation occurrence category Collision with terrain
Occurrence class Accident
Highest injury level None

Aircraft details

Manufacturer De Havilland Canada/De Havilland Aircraft of Canada
Model DHC-2 MK 1
Registration VH-AWI
Serial number 298
Sector Piston
Operation type Charter
Departure point Hardy Lagoon, Qld
Destination Shute Harbour, Qld
Damage Minor

Descent below minimum descent altitude involving a Boeing 737-300, VH-NLK, Kosrae International Airport, Federated States of Micronesia, on 12 June 2015

Final report

What happened

On 12 June 2015, the crew of a Boeing B737-300, registered VH-NLK, were conducting a non-directional beacon/distance measuring equipment (NDB/DME) approach into Kosrae Airport in the Federated States of Micronesia. The flight was the inaugural regular public transport (RPT) flight for Nauru Airlines into Kosrae. During the approach, at night and in instrument meteorological conditions, the aircraft descended below the minimum descent altitude and three enhanced ground proximity warning system (EGPWS) ‘too low terrain’ alerts were triggered. A go-around was performed prior to the aircraft reaching the missed approach point. During the go-around, the airspeed decayed and required the pilot to use full thrust. The flight crew identified and corrected the barometric pressure setting and the subsequent approach and landing into Kosrae were uneventful.

What the ATSB found

The flight crew did not complete the approach checklist before commencing the non-precision NDB approach into Kosrae, resulting in the barometric pressure setting on the altimeters not being set to the local barometric pressure. This resulted in the aircraft’s altitude being lower than what the pressure altimeter was indicating to the pilots. The aircraft descended below the EGPWS terrain clearance floor profile for the Kosrae runway, resulting in three separate EGPWS alerts.

Terrain clearance assurance was eroded further after receiving the first two EGPWS alerts by the flight crew not correcting the flight profile. The crew's belief that the EGPWS alerts were due to a decreased navigational performance and not terrain proximity led to the crew’s decision to inhibit the first EGPWS alert and not correct the flight path.

The flight crew initiated a missed approach when they lost visual contact with the runway. The captain was experiencing fatigue and the flight crew had an increased workload and stress due to the inaugural RPT flight into Kosrae at night in rapidly deteriorating weather. As a result, the crew’s decision making and task execution on the missed approach were affected, and the aircraft state, airspeed and attitude were not effectively monitored by either crew member.

The ATSB also found that there were established risk factors associated with Kosrae at the time the operator commenced regular public transport operations into Kosrae. The only instrument approach available for use was an offset procedure based on a non-precision navigation aid. The risk associated with this type of approach was amplified due to the need to use a 'dive and drive' style technique instead of a stable approach path, and that it required low level circling manoeuvring from the instrument approach to align the aircraft with the runway. Furthermore, there was very high terrain in close proximity to the runway and the airport did not have a manned air traffic control tower.

What's been done as a result

Following this occurrence, the operator has reviewed and changed procedures relating to:

  • increased time for flight crew on non-standard/non-routine activities during their cyclic training program
  • reviewed and included control column checklists, which includes the descent and approach checklist, with tactile indicators
  • included two-engine go-arounds in simulator sessions
  • reviewed and improved awareness of QNH setting procedures and human factors aspects of briefings and line checks.

Safety message

This occurrence highlights the importance of flight crews declaring any instances of acute fatigue and stress-inducing circumstances that may have an impact on their flying performance. Operators also need to remind flight crew of the importance of their decisions with regards to their fitness to fly. For flight crews, the importance of completing approach checklists and monitoring the approach at safety critical times is emphasised. For operators, the occurrence highlights the importance of incorporating dual-engine go-arounds into simulator training sessions.

Findings

From the evidence available, the following findings are made with respect to the Enhanced Ground Proximity Warning System (EGPWS) alerts involving a Boeing 737-300, VH-NLK, at Kosrae International Airport, Federated States of Micronesia, on 12 June 2015. These findings should not be read as apportioning blame or liability to any particular organisation or individual.

Safety issues, or system problems, are highlighted in bold to emphasise their importance. A safety issue is an event or condition that increases safety risk and (a) can reasonably be regarded as having the potential to adversely affect the safety of future operations, and (b) is a characteristic of an organisation or a system, rather than a characteristic of a specific individual, or characteristic of an operating environment at a specific point in time.

Contributing factors

  • The flight crew did not complete the approach checklist before commencing the non-precision NDB approach into Kosrae. As a result, the altimeters' barometric pressure settings remained at the standard setting of 1013 hPa instead of being set to the reported local barometric pressure of 1007 hPa. The flight crew descended the aircraft to the minimum descent altitude of 500 ft as indicated by the altimeters, however, due to the barometric pressure setting not being reset, the aircraft descended to a height significantly below 500 ft.
  • The crew descended the aircraft in IMC and at night below the approach profile for the Kosrae runway, resulting in EGPWS alerts. Terrain clearance assurance was eroded further by the flight crew not correcting the flight profile until the flight crew lost visual contact with the runway.
  • The flight crew's belief that the EGPWS warnings were due to a decreased navigational performance and not terrain proximity led to their decision to inhibit the first EGPWS warning and not correct the flight path.
  • Due to the captain’s fatigue and the increased workload and stress associated with the inaugural regular public transport flight into Kosrae at night in rapidly deteriorating weather, the crew’s decision making and task execution on the missed approach were affected.

Other factors that increased risk

  • The crew’s recurrent training had not included B737-300 full thrust go-around simulations.
  • The operator commenced regular public transport operations into Kosrae with the only instrument approach available for use being an offset procedure based on a non-precision navigation aid. The risk associated with this type of approach was amplified due to the need to use a 'dive and drive' style technique instead of a stable approach path, and that it required low level circling manoeuvring from the instrument approach to align the aircraft with the runway. Furthermore, there was very high terrain in close proximity to the runway and the airport did not have a manned air traffic control tower. For this occurrence, the risk was further elevated as a result of the approach being conducted at night-time in poor weather conditions. [Safety issue]

Sources and submissions

Sources of information

The sources of information during the investigation included the:

  • flight crew and operator of VH-NLK
  • aircraft enhanced ground positioning warning system (EGPWS)
  • EGPWS manufacturer
  • The US Federal Aviation Administration
  • Airservices Australia
  • Civil Aviation Safety Authority.

References

Battelle Memorial Institute. (1998). An Overview of the scientific literature concerning fatigue, sleep, and the circadian cycle, Report prepared for the Office of the Chief Scientific and Technical Advisor for Human Factors, US Federal Aviation Administration.

Bureau d’Enquêtes et d’Analyses pour la sécurité de l’aviation civile (BEA). (2013). Study on aeroplane state awareness during go-around. Available from www.bea.aero/etudes/asaga/asaga.php

Dawson, D., & McCulloch, K., (2005). ‘Managing fatigue: It’s about sleep’, Sleep Medicine Reviews, vol. 9, pp. 365-380.

Dismukes, K. (2006). Concurrent task management and prospective memory: pilot error as a model for vulnerability of experts. In Proceedings of the Human Factors and Ergonomics Society 50th Annual Meeting – 2006, pp. 909-913.

Dismukes, R.K. and Berman, B. (2010). Checklists and monitoring in the cockpit: Why crucial defences sometime fail. National Aeronautics and Space Administration Technical Memorandum NASA/TM-2010-216396. Ames Research Centre: Moffett Field, US.

Flight Safety Foundation (FSF) (1998). Flight Safety Digest, November 1998—February 1999: “Killers in Aviation”. Available from flightsafety.org

Gaillard, A.W.K. (2001). Stress, workload and fatigue as three biobehavioural states: A general overview. In P.A. Hancock, & P.A. Desmond (Eds.), Stress, workload, and fatigue. Mahwah, NJ: L. Erlbaum.

Gawron, V.J., French, J., & Funke, D. (2001). An overview of fatigue. In P.A. Hancock, & P.A. Desmond (Eds.), Stress, workload, and fatigue. Mahwah, NJ: L. Erlbaum.

Orlady, H.W., & Orlady, L.M. (1999). Human factors in multi-crew flight operations. Ashgate: Aldershot, UK p.203.

Thomas, M.J.W., & Ferguson, S.A., (2010). Prior sleep, prior wake, and crew performance during normal flight operations, Aviation, Space, and Environmental Medicine, vol. 81, pp. 665-670.

Staal, M.A. (2004). Stress, cognition and human performance: A literature review and conceptual framework. National Aeronautics and Space Administration Technical Memorandum NASA/TM–2004–212824. Ames Research Centre: Moffett Field, US.

Williamson, A., Lombardi, D.A., Folkard, S., Stutts, J., Courtney, T.K., & Connor, J.L., (2011). The link between fatigue and safety, Accident Analysis and Prevention, vol. 43, pp. 498-515.

Submissions

Under Part 4, Division 2 (Investigation Reports), Section 26 of the Transport Safety Investigation Act 2003 (the Act), the Australian Transport Safety Bureau (ATSB) may provide a draft report, on a confidential basis, to any person whom the ATSB considers appropriate. Section 26 (1) (a) of the Act allows a person receiving a draft report to make submissions to the ATSB about the draft report.

A draft of this report was provided to the flight crew, Nauru Airlines, the Federated States of Micronesia, and the Civil Aviation Safety Authority.

Submissions were received from the Civil Aviation Safety Authority and Nauru Airlines. The submissions were reviewed and where considered appropriate, the text of the report was amended accordingly.

Safety analysis

Introduction

While positioning the aircraft to commence the non-directional beacon/distance measuring equipment (NDB/DME) approach into Kosrae airport, Federated States of Micronesia, the approach checklist was not completed and so the altimeters were not set to the local barometric pressure. This resulted in the aircraft’s actual altitude being180 ft lower than the pressure altimeter’s reading. Three enhanced global positioning warning system (EGPWS) ‘Too Low Terrain’ alerts were triggered due to the aircraft's altitude being below the minimum terrain clearance.

The flight crew believed that the EGPWS alerts were due to decreased navigational performance and not terrain proximity. This led to the flight crew’s decision to inhibit the first EGPWS alert and not correct the flight path prior to their deciding to perform a go-around manoeuvre.

The captain stated that he was fatigued and the crew stated that they were experiencing increased workload. This appears to be due to the flight being the inaugural regular public transport flight into Kosrae, conducted at night in rapidly deteriorating weather. Fatigue, workload and stress appear to have affected the crew’s decision making and task execution on the missed approach.

This analysis will examine the type of approach procedure available to the flight crew for Kosrae, the operator’s operational procedures, the conduct of the go-around manoeuvre and the effects of fatigue, workload and stress on the occurrence.

Level of risk associated with the approach

The Flight Safety Foundation’s Approach and Landing Accident Reduction task force provided a number of focal points that were present in the occurrence approach into Kosrae, which in turn indicated an elevated level of risk associated with that approach.

Risk associated with the localised high terrain was mitigated by the aircraft having EGPWS based warning systems fitted. Risk factors of a night-time approach into an airport without a manned tower were the result of delays encountered over the previous sectors, issues that should be considered by the operator in a risk analysis for operations into Kosrae before commencing these operations. A further risk factor necessary for consideration prior to commencing operations into Kosrae was that there were only two types of instrument approaches: runway aligned GPS-based approaches, and the offset non-precision approach. As the occurrence aircraft was not fitted with equipment required for GPS based approaches, and the operator not approved to conduct them, the only option for operations into Kosrae was to conduct a non-precision approach. This elevated the risk associated with the approach, and that risk was further amplified by:

  • the approach necessitating a ‘dive and drive’ profile due to:
    • the offset of the final approach course from the runway heading
    • the location and height of the missed approach point, which was well below a normal 3 approach profile.
  • the need to conduct low level manoeuvring from the missed approach point to enable the aircraft to align with the runway.

The aircraft’s navigation system also represented a significant risk factor in the conduct of this approach. While the operator’s procedure required the use of raw navigational data for the approach, the use of an NDB as a primary approach aid is subject to several effects that can result in error, including the night effect, thunderstorm activity and localised high terrain, which were all potential sources of navigation error in this occurrence.

Further, due to the limited number of navigation aids available on the occurrence sector, the navigation system was dependent on inertial reference for position data. This will often result in the ‘map shift’ error being presented to the pilots, where the pilot’s navigation displays are significantly ‘shifted’ from the actual real-world position of the displayed data, and can contribute flight crew error. With respect to the occurrence flight, the flight crew incorrectly believed that the initial EGPWS alerts were the result of a ‘map shift’ error; however, a comparison between the aircraft’s quick access recorder data and the EGPWS GPS data identified a map shift error of about 1 NM seawards of where the aircraft’s actual position was.

The flight crew’s conduct of a briefing for the approach, and decision to perform a go-around when visual contact with the runway was lost, mitigated the risks to some extent.

Approach checklist

Prospective memory can be defined as the intention to perform an action in the future, coupled with a delay between recognising the need for action and the opportunity to perform it. A distinguishing feature of prospective memory is the need for an individual to remember that they need to remember something. Researchers (Dismukes, 2006) have identified that prospective memory issues may result in a failure to return to a task or procedure that has been interrupted, even when the task or procedure is habitual.

The crew had briefed the new transition level at top of descent and had briefly discussed the need to conduct the approach checklist on passing through the transition level when they were descending through FL 130 (the usual transition level). The crew had put a plan in place to complete the checklist. However, as they were flying over the non-directional beacon at FL 050 and were looking at the runway in preparation for the commencement of the approach, workload began to rise and they forgot to return to the approach checklist and complete it, as per a prospective memory error. Thus, as the aircraft descended through the transition level, the altimeters were not set to the local barometric pressure from the standard pressure setting of 1013 hPa and, as a result were over-reading the aircraft’s altitude by 180 ft. The aircraft’s actual height was, on average, 120 ft lower than the aircraft’s indicated altitude.

EGPWS warnings and crew response

The EGPWS issued a series of Terrain Clearance Floor (TCF) alerts during the NDB/DME approach into Kosrae. The EGPWS recorded data for a period around the EGPWS events. At the beginning of recording, the aircraft was 5.1 NM from the runway, with landing gear down, at a radio altimeter height of 663 feet and a vertical speed of -1,011 fpm. At approximately 19, 25 and 61 seconds after the commencement of the EGPWS recording, the EGPWS issued a ‘TOO LOW TERRAIN’ alert due to the aircraft’s penetration of the TCF envelope.

The EGPWS also recorded a ‘terrain inhibit’ parameter which corresponded to the pilot selection of the terrain inhibit feature. In the recorded data, the terrain inhibit was activated for two seconds, occurring four seconds after the beginning of the first TCF alert.

The flight crew stated that they heard the EGPWS warning prior to their reaching the missed approach point (MAP) and that they had the runway lights in sight although the visibility was fluctuating, and decided to keep going because they had a visual reference for the runway. Furthermore, the flight crew thought the warnings were due to map shift. Therefore, the flight crew believed the warnings were false and inhibited the first warning due to this belief.

The operator’s operations manual stated that, in instrument meteorological conditions (IMC), all EGPWS alerts were to be treated as genuine and flight crew must take rectification or avoidance action immediately. The operator’s flight crew operations manual stated that if positive visual verification was made that no obstacle or terrain hazard existed when flying under daylight VMC conditions prior to a terrain or obstacle warning, the alert could be regarded as cautionary and the approach continued.

The investigation found that the approach was being conducted at night in intermittent visual conditions prior to the aircraft going into IMC conditions just prior to the MAP. In these conditions, the EGPWS warnings should have been treated as genuine and action taken immediately rather than the crew inhibiting the alert.

Fatigue, workload and stress

The captain’s mother had become ill and her health had severely degraded by the time the captain arrived in Nauru from Brisbane. The captain stayed with her at the hospital for as long as possible before returning to his hotel where he had a disrupted night’s sleep of less than 6 hours. At the time of the EGPWS warnings, the captain had been awake for about thirteen hours and reported feeling fatigued.

The crew reported that their workload increased following the EGPWS alerts due to the deteriorating weather and distraction of the Kosrae flight information service (FIS) providing wind velocity change and visibility updates. The first officer stated that the FIS updates interrupted the crew’s working through checklists, as they needed to listen and respond. The effect of the increased workload would have been exacerbated by the stress of flying the operator’s inaugural RPT flight into Kosrae with Nauruan dignitaries on board.

For the captain, the workload would have been further exacerbated by the stress of his mother’s illness and the fatigue of a disrupted night’s sleep. The captain stated that in hindsight, he should have removed himself from the flight but didn’t want to as he was only one of two Nauruan captains employed by the operator and it was his turn to fly an important flight. He did not inform the operator of his mother’s illness.

On the decision to go-around, the captain pressed the takeoff/go-around button only once instead of twice, which resulted in a reduced thrust rather than a full power go-around. The aircraft was pitched up initially to 15° but was then pitched back down to increase the decaying airspeed. Soon after, the aircraft was at its lowest height of 200 ft by the radio altimeter. Given the increased workload of the crew, and the effects of stress and fatigue on the captain, the aircraft state, airspeed and attitude was not effectively monitored by either crew member following the go-around decision. Therefore, the execution of the go-around task and its attendant decision making was not performed effectively.

The go-around manoeuvre and recurrent training

The survey on the conduct of the go-around manoeuvre by the Bureau d’Enquêtes et d’Analyses (BEA, 2013) identified that it was common for the pilot flying to experience aircraft handling difficulties during the initial phase of the all-engine go-around manoeuvre, and that there was a general lack of training for the all-engine go-around manoeuvre.

With respect to the incident pilot’s handling issues during the go-around, these may have been affected by fatigue, workload and stress. However, it is also likely that these handling issues were contributed to by the limited training for the all-engine full-thrust go-around. The development of a recurrent training syllabus is a complex process and, as well as meeting specific regulatory requirements, involves operators making decisions about which of many important tasks and situations need to be included in each session. Go-arounds with one engine inoperative are typically conducted in every recurrent training session, and there has been increasing recognition that regularly practicing all-engine go-arounds is also important (BEA, 2013). Although the procedural steps are fundamentally the same, the increase in energy and time pressure associated with an all-engine go-around provides different challenges.

There are many permutations of the go-around task that need to be covered in recurrent training. A lesson from this occurrence and many similar occurrences is that flight crews should be regularly exposed to the time pressure and challenge of conducting full thrust go-arounds.

At the time of the occurrence, the operator did not include full-thrust go-arounds as part of their simulator-based recurrent training for their pilots. Although the inclusion of more go-around training including these aspects will reduce the overall risk associated with go-arounds, it is difficult to conclude that they would necessarily have reduced the likelihood of this occurrence.

The occurrence

On 12 June 2015, a Nauru Airlines[1] Boeing 737-300 aircraft, registered VH-NLK, operated a scheduled passenger flight originating in the Republic of Nauru and transiting Tarawa, Republic of Kiribati, and Marshall Islands Airport, Majuro atoll, Republic of the Marshall Islands, to Kosrae Airport and finally Pohnpei Airport, both in the Federated States of Micronesia (FSM). This was the operator’s inaugural scheduled regular public transport service to Kosrae and Pohnpei. Travelling on-board were the Nauruan President, the Nauruan Minister of Aviation, and the Chairman of the Board of Directors of Nauru Air Corporation. In the six weeks preceding this flight, the operator had flown three charter flights to the FSM airports. The captain also stated that he had flown a couple of charter flights (during the day) into Kosrae before this inaugural scheduled service.

The flight was originally scheduled to leave Nauru at 0230 Coordinated Universal Time (UTC) (1430 Nauru Time).[2] However, a technical issue with the original aircraft led to a change to VH‑NLK. This resulted in the aircraft departing 60 minutes late. The flight crew, comprising of a captain and first officer, originated in Nauru having been positioned there from their base in Brisbane, Queensland, the day before.

The sector from the Marshall Islands to Kosrae was delayed a further 17 minutes due to ground handling issues. The flight departed after last light at 0740 and the planned flight time was 1 hour 19 minutes. The approach and landing at Kosrae was at night.

For this sector, the captain was the pilot flying, and the first officer was the pilot monitoring.[3] During the climb to the planned cruising altitude of flight level (FL)[4] 360, in accordance with standard procedures, the flight crew selected the standard atmospheric pressure of 1013 hPa on the altimeters.

The flight crew stated that, prior to commencing the descent for Kosrae, they obtained the weather and the local QNH.[5] The weather had deteriorated from that forecast (see section titled Meteorological information). The flight crew also stated that, during the descent and approach, the local flight information service radio operator[6] provided a considerable number of weather updates on the local airport conditions at Kosrae. Visibility was around 3 NM, rain showers were in the area with low cloud and wind ‘pretty much straight down the strip for (runway) 05’. The captain, as pilot flying, conducted the briefing for the non-directional beacon (NDB)[7]/distance measuring equipment (DME)[8] approach to runway 05 (Figure 1). The captain stated that, at this time, they had made special mention of the unusually low transition level[9] of FL 55. The captain stated that at most airports they operated into, the transition level was between FL 110 and FL 130.

The crew then completed the descent checklist. They had decided that, based on the expected weather conditions, they would make two approach attempts, and if they could not land, would divert to Nauru Airport, the nominated alternate airport. Prior to descending below the transition level, the crew did not complete the approach checklist, which consisted of one item: set the altimeters to the local QNH and crosscheck them. Leaving the altimeters’ subscale set to the standard atmospheric pressure setting of 1013 hPa, and not setting the subscale to the local barometric pressure of 1007 hPa, resulted in the indicated altitude over-reading, such that when the altimeter indicated 500 ft, the aircraft’s actual altitude was about 320 ft above the mean sea level.

Figure 1: Kosrae NDB/DME-A approach chart with the transition altitude and level, and missed approach point highlighted

Figure 1: Kosrae NDB/DME-A approach chart with the transition altitude and level, and missed approach point highlighted. Source: Jeppesen – annotated by ATSB
Source: Jeppesen – annotated by ATSB

At about 0856, the aircraft passed overhead the NDB at 5,000 ft, and continued the descent, tracking outbound on a heading of 300°, to about 10 NM from the NDB (10 DME). The flight crew were controlling the aircraft through the auto-flight systems, with an autopilot and the autothrottle engaged. At this point, the crew turned the aircraft left, and at 0901, the aircraft intercepted the inbound track to the NDB at about 1,800 ft. The crew selected the landing gear down at 1,500 ft, and flap 15 at 1,250 ft.

The crew stated that they established visual contact with the runway as the aircraft passed through 900 ft indicated altitude, about 5 NM from the DME. At about 740 ft indicated altitude, the crew selected flap 25. The crew elected to delay selection of the nominated landing flap of 40 degrees until they made positive visual contact with the runway. They did not subsequently select flap 40 on that approach.

As the aircraft descended to the minimum descent altitude for the approach of 500 ft, the captain selected the altitude hold (ALT HOLD) mode to level the aircraft at 500 ft indicated altitude. At 0903:13, an Enhanced Ground Proximity Warning System (EGPWS) Terrain Clearance Floor (TCF) alert (see section titled EGPWS alerts) sounded, and lasted for 5 seconds (Figure 2). The aircraft was over water, at 368 ft radio altitude.[10] The crew reported that they were in visual meteorological conditions (VMC) at night, with the runway lights in sight. The crew stated that, at the time, they believed the EGPWS alert was due to a ‘map shift’ in the aircraft’s navigation position (see section titled The navigation function of the flight management system). The flight crew selected ‘terrain inhibit’, which cancelled the current EGPWS TCF alert. The crew were not aware that the EGPWS had its own internal GPS.

At 0903:19, the aircraft was at 4.31 DME, 480 ft indicated altitude and 340 ft radio altitude, and descending at about 313 fpm, when the EGPWS TCF alert again sounded, and lasted for 12 seconds. The aircraft maintained 480 ft indicated altitude for about 12 seconds, before descending again.

Figure 2: Approach profile annotated with indicated and radio altimeter readings highlighting the difference between the displayed and actual altitudes plus the three EGPWS Terrain Clearance Floor alerts and the Terrain Inhibit alert cancellation activation

Figure 2: Approach profile annotated with indicated and radio altimeter readings highlighting the difference between the displayed and actual altitudes plus the three EGPWS Terrain Clearance Floor alerts and the Terrain Inhibit alert cancellation activation. Source: FAA and ATSB

Source: FAA and ATSB

The crew reported losing visual reference with the runway when the aircraft was about 3 NM from the DME. In response to losing visual reference, the captain disconnected the autopilot and autothrottle and pressed the take-off/go-around (TOGA) switches on the thrust levers. At this time the recorded aircraft pitch angle was 9.5°. The flight data recorder data showed that TOGA was selected at 0903:47, at 448 ft indicated altitude, or 304 ft radio altitude (see Figure 3), and the aircraft was about 3.5 NM from the DME. At this time, the aircraft’s computed airspeed reduced to 129 kt.

The captain stated that he pressed the TOGA switches on the thrust levers once. In the Flight Director engaged go-around mode, one TOGA switch press results in a reduced thrust autothrottle setting, and two presses of the TOGA switch advances the autothrottle to full go-around thrust (see section titled Autothrottle go-around modes). The crew stated that the aircraft pitch angle was initially raised to 15°, however, the captain observed the airspeed decay and pitched the aircraft down to increase the airspeed. The first officer stated he called ‘sink rate’ twice. The captain then realised and rectified the situation, depressing the TOGA switch a second time commanding full go-around thrust.

At 0903:53, the aircraft was at 3.3 DME, and the third EGPWS TCF alert sounded, which lasted for 10 seconds. The aircraft was then at 384 ft indicated altitude, or 244 ft radio altitude, and descended 5 seconds later to its lowest radio altitude of 200 ft before climbing.

At 0904:04, the flaps were retracted to 15° and the aircraft reached its maximum pitch up angle of 16°. Two seconds later, the flaps were retracted to 10°. From the time the captain set the thrust to TOGA until the aircraft was stabilised on the missed approach path (at about 0905), the recorded aircraft pitch angle varied from -0.35° to +16°.

Figure 3: Selected flight data recorder data plot

Figure 3: Selected flight data recorder data plot. Source: ATSB

Source: ATSB

When the aircraft was established on the missed approach heading, the captain continued a climb to 4,000 ft. After stabilising the aircraft in the missed approach, the crew identified that the altimeters were still set to 1013 hPa and corrected them to the local area QNH. After repositioning overhead, the NDB at 4,000 ft, the crew then conducted a second approach and the aircraft landed at Kosrae without further incident.

__________

  1. The operator’s Air Operator’s Certificate was issued to Nauru Air Corporation, trading as Nauru Airlines (also known as Our Airline). The airline is the flag carrier airline of the Republic of Nauru. Since 1996, the airline has been operating under Australian civil aviation regulations with an Australian Air Operators Certificate.
  2. Coordinated Universal Time is the time zone used for civil aviation. Nauru local time was UTC + 12 hours and Kosrae local time was UTC + 11 hours. UTC will be used for the remainder of this report unless otherwise stated.
  3. Pilot flying and pilot monitoring are procedurally assigned roles with specifically assigned duties at specific stages of a flight. The PF does most of the flying, except in defined circumstances; such as planning for descent, approach and landing. The PM carries out support duties and monitors the PF’s actions and aircraft flight path.
  4. Flight level: at altitudes above 10,000 ft in Australia and 5,000 ft in FSM, an aircraft’s height above mean sea level is referred to as a flight level (FL). FL 360 equates to 36,000 ft.
  5. The altimeter barometric pressure subscale setting used to indicate the height above mean sea level.
  6. Kosrae airport did not have an air traffic control tower. The airport operated a common traffic advisory frequency, which included a flight information type service that was located at the airport.
  7. A non-directional beacon is an automatic direction-finding radio transmitter at a known location, used as a navigational aid.
  8. Distance measuring equipment is a transponder-based radio navigation technology that measures slant range distance, or the distance between two points not at the same level – for example, the distance from an aircraft at altitude to a radar antenna.
  9. Flight above the transition layer is flown at an altimeter setting of 1013 hPa, and flight below transition level is flown by reference to the local QNH.
  10. Radio altitude is measured by the radio altimeter, an airborne electronic device capable of measuring the height of the aircraft above terrain immediately below the aircraft.

Context

Flight crew information

The captain

The captain held an Air Transport Pilot (Aeroplane) Licence, a multi-engine command instrument rating and a Class 1 Aviation Medical Certificate. The captain had a total of 16,600 hours of aeronautical experience, of which 16,100 hours were on the Boeing 737.

The captain’s last instrument rating had been completed on 14 January 2015 and the last flight review line check completed on 14 February 2015.

The captain reported sleeping well on the nights of 9 and 10 June 2015, obtaining 9.5 and 7 hours on the respective nights. On arriving at Nauru (11 June), he discovered that his mother was very ill. The night prior to the Kosrae duty, he had spent a significant amount of time at the hospital with his mother. The captain stated that he tried to get a few hours decent sleep prior to going to work, achieving five to six hours sleep between 0100 and 0700 local.

In interview, the captain stated that he had not informed the company of the situation with his mother. Some of his colleagues knew that his mother was sick, but not the extent of her illness. The captain stated that he believed it might have led to fatigue because he did not have a good sleep the night prior.

The captain stated that, in hindsight, it would have been better to remove himself from duty, but stated that it was his turn (to be the Nauruan captain flying for Nauruan dignitaries). He saw his mother every time he flew to Nauru and took the opportunity to go see her when he was requested to captain the inaugural Nauru Airlines scheduled service into the Federated States of Micronesia.

The first officer

The first officer held an Air Transport Pilot (Aeroplane) Licence, a multi-engine command instrument rating and a Class 1 Aviation Medical Certificate. The first officer had a total of 3,300 hours of aeronautical experience, of which 1,600 hours were on the Boeing 737.

The first officer’s last instrument rating had been completed on 8 October 2014 and the last line check completed on 3 March 2015.

The first officer reported obtaining 8 hours sleep on the night of 9 June 2015 and 5 hours on the night of 10 June. He reported getting a 2-hour nap as a passenger during the positioning flight from Brisbane to Nauru on 11 June and then obtained 12 hours sleep the night prior to the occurrence flight. The first officer reported feeling well rested.

Recent duty

The captain and first officer were based in Brisbane. The captain had not had a duty period since 5 June and had time off for the days prior to the positioning flight to Nauru on 11 June. The first officer had not had a duty period since 8 June and flew a positioning flight as a passenger from Nauru to Brisbane on 9 June, had 10 June off, and flew on the positioning flight to Nauru on 11 June.

Relevant aircraft systems

The navigation function of the flight management system

The aircraft was equipped with a flight management system (FMS) to assist the flight crew in managing the aircraft’s automatic navigation systems, and associated flight management functions. Inputs from two inertial reference systems (IRS) and specific ground-based radio navigation aids, through a number of FMS controlled radio navigation receivers,[11] enabled the FMS to determine the aircraft’s position. The aircraft was not fitted with a global positioning system (GPS) navigation unit. The accuracy of the FMS navigation data was dependent on the types of navigation aids used to generate navigation fixes, with specific combinations of radio navigation aids providing the most accurate data. However, when these were not available the FMS used IRS position information only. Due to the nature of the IRS, the accuracy of this source of position information decreased with elapsed time.

As FMS navigation accuracy decreased, an effect known as ‘map shift’ became prevalent. Map shift is where the navigation data presented to the pilot on the navigation display shifts from their actual positions as a result the inaccuracy of the FMS derived navigation position. Map shift is a common symptom of the FMS having an extended period of being reliant on IRS for navigation data. With respect to the occurrence, the positional data from the FMS was probably IRS based for the entire flight, due to the absence of the required navigation aids for that sector.

The flight data recorder’s recorded position information was sourced from the FMS derived aircraft position. There were inaccuracies identified in the FMS position from the commencement of the flight, with the runway position at take-off being about 810 m to the south-west of the actual runway threshold.

Enhanced ground proximity warning system (EGPWS)

VH-NLK was fitted with a ‘Class A’ terrain awareness and warning system that provided a terrain awareness display as well as the functions and features of a ground proximity warning system (GPWS). The unit, designated as being an enhanced ground proximity warning system (EGPWS), provided two types of alerts:

  • Look-ahead terrain alerts: the EGPWS function monitored the aircraft’s position, acquired through a self-contained global positioning system (GPS) receiver, against terrain proximity using an internal worldwide terrain database. If there was a potential terrain conflict, alerts were provided based on estimated time to impact.
  • GPWS type alerts: based on radio altimeter height and combinations of barometric altitude, airspeed, glide slope deviation, and aircraft configuration.

The look-ahead terrain alerts and radio altimeter height-based alerts were prioritised based on the level of hazard and the required crew reaction time.

The EGPWS recorded a significant selection of aircraft data associated with an alert, including GPS position and radio altimeter height, as well as the type of alert triggered. The EGPWS unit triggered three ‘TOO LOW TERRAIN’ alerts during the approach into Kosrae, at 0903:13-17, 0903:19-29 and 0903:54 to 0904:02. These alerts were terrain clearance floor (TCF) alerts. The data also identified a ‘terrain inhibit’ parameter following the first alert.

The EGPWS based TCF function used a terrain clearance envelope around the airport runway to provide protection against controlled flight into terrain situations where the existing GPWS unsafe terrain clearance protections provide limited or no protection. TCF alerts are based on current aircraft location, destination runway centre point position, and radio altimeter height. TCF is active during take-off, cruise, and final approach.

When an aircraft penetrates the TCF alert envelope, the aural message ‘TOO LOW TERRAIN’ will occur. The initial penetration of the TCF alert envelope was the trigger for the first EGPWS alert. This aural message will also occur post the initial envelope penetration for each 20 per cent degradation in height. This was the trigger for the second EGPWS alert. EGPWS cockpit alert annunciations remain illuminated until the alert envelope is exited. The EGPWS data indicates that the aircraft exited the TCF envelop after the second alert, but then re-entered the envelope after the flight crew had commenced the missed approach manoeuvre. This was the trigger for the third EGPWS alert. At the time of the three alerts, the aircraft configuration was gear down with flap 25. This was considered to be a landing configuration.

There were two EGPWS indicators and controls relevant to the unit’s operation. The instrument panel (Figure 4) includes the PULL UP warning light in the field of vision of both pilots.

Figure 4: B737-300 flight deck instrument panel EGPWS indicators and controls

Figure 4: B737-300 flight deck instrument panel EGPWS indicators and controls. Source: Boeing, modified by the ATSB

Source: Boeing, modified by the ATSB

The lower right section of the instrument panel included the GPWS controls. The terrain inhibit switch (7) in the NORM (guarded position) enabled EGPWS features. When selected to TERR INHIBIT, terrain/obstacle alerting was inhibited. Aircraft flight data identified that the first EGPWS alert had an associated inhibit signal. This inhibit signal was due to the flight crew selecting the terrain inhibit switch to ON following the first warning alert.

The Boeing 737 flight crew operations manual, which was the company’s approved reference, stated that the response for the TCF alerts was to correct the flight path, aircraft configuration, or airspeed. The manual also stated:

If a terrain caution occurs when flying under daylight VMC, and positive visual verification is made that no obstacle or terrain hazard exists, the alert may be regarded as cautionary and the approach may be continued.

The flight crew’s response to the first two EGPWS alerts did not appear to comply with the procedural requirements. The alerts did not occur in daylight VMC conditions and the crew’s visual reference with the runway or terrain was reported as intermittent. The crew’s response was stated to be due to the belief that the alert was the result of map shift issues and not because of ground proximity.

Comparison of FMS vs EGPWS position

The FMS did not have access to the EGPWS GPS information. The FMS recorded position of the aircraft at the time of the EGPWS alerts was compared against the position data recorded by the EGPWS. From the image below (Figure 5), it is evident that there was an FMS position error (approximately 1,065 m NW of the GPS position) at the time of EGPWS alerts. After the go-around, the FMS data appears to drift significantly (2,090 m north-north-west at landing), providing less reliable position information. It is important to note that the FMS derived position data was not required for the approach that was undertaken.

Figure 5: The flight data recorder data is shown below in blue and the EGPWS data is in red showing that, prior to the go-around, there was a 1.0 NM positional error to the flight management computer determined position

Figure 5: The flight data recorder data is shown below in blue and the EGPWS data is in red showing that, prior to the go-around, there was a 1.0 NM positional error to the flight management computer determined position. Source: Jeppesen, modified by the ATSB

Source: Jeppesen, modified by the ATSB

Autothrottle go-around modes

There were two autothrottle go-around modes, the autopilot (AP) go-around (which required dual AP operation) and Flight Director (FD) go-around (which is the reversion mode when both APs were not engaged). The FD go-around required the aircraft to be in flight and below 2,000 feet radio altitude, and not in the take-off mode. The flight crew operations manual included the following discussion concerning the FD go-around mode:

  • With the first push of either take-off/go-around (TOGA) switch, the:
    • autothrottle (if armed) engages in go-around and advances thrust toward the reduced go-around N1[12] to produce 1,000 to 2,000 fpm rate of climb
    • autothrottle engaged mode annunciation on the flight mode annunciator (FMA) indicates go-around
    • AP (if engaged) disengages
    • pitch mode engages in TOGA and the pitch engaged mode annunciation on the FMA indicates TOGA
    • FD pitch commands 15 degrees nose up until reaching programmed rate of climb, and thereafter commands manoeuvring speed for each flap setting based on maximum weight calculations.
  • With the second push of either TOGA switch (if autothrottle engaged and after autothrottle reaches reduced go-around thrust), the autothrottle advances to the full go-around N1 limit.

The captain stated that he was not used to conducting a reduced thrust two engine go-around because he had always practiced a one-engine go-around in the simulator, which automatically provided full engine thrust from a single TOGA switch push. The captain stated that he had conducted a few full thrust go-arounds previously but in VMC conditions.

The Kosrae NDB/DME approach

The instrument approaches available for Kosrae were RNAV (GPS) approaches to runways 23 and 05, and the non-directional beacon (NDB) /distance measuring equipment (DME) approach. As VH-NLK was not fitted with GPS navigational equipment, the only instrument approach available to the flight was the NDB/DME approach.

The NDB/DME approach was classified as a circling approach only, due to the final approach course being offset from runway 05 heading by more than 30°. The missed approach point for this approach was at 2.9 DME with a minimum descent altitude of 500 ft.

According to the recorded data, prior to becoming established on the instrument approach, the aircraft overflew the NDB, turned onto the missed approach heading of about 300°, and then tracked outbound to the 10 DME arc before turning inbound on the 264° radial (see Figure 5). The recorded flight data identified that the aircraft descended below the published profile of 900 ft at 6.7 DME rather than 5 DME. The aircraft was required to remain at 500 ft until established on the final approach path for landing. However, the altimeter recorded 432 ft (radio altitude height of 306 ft) when the captain commenced the go-around.

Nauru Airlines procedures

Transition level

The flight crew reported that the transition level of FL 55 at Kosrae was lower than other ports in their network, which were typically FL 110 to FL 130. The crew stated that they had briefed the lower transition level prior to top of descent and had reminded themselves of the lower level while passing through FL 130. They also stated that the lower transition level, combined with increased crew workload on the approach due to deteriorating weather, led to the crew forgetting the approach checklist, therefore not setting the correct QNH.

The operator’s flight crew operating manual stated that setting the QNH during the descent required the local QNH to be set as the aircraft approached the transition level. Each pilot was required to call the exact altimeter indications and compare the indications to detect any discrepancy between instruments. Positive altimeter calls were also required to be carried out during the descent at FL 150, the transition level, and at 5,000 ft above aerodrome elevation.

As the local QNH was reported to be 1007 hPa and the crew left the QNH set at the standard pressure of 1013 hPa, the pilots’ altimeters were over-reading by 180 ft during the approach.

Instrument approach criteria

The company’s operations manual stated that ‘all approaches are to be flown in a stabilised manner with the aircraft established in the correct configuration no later than 1,000 ft above ground level for instrument approaches and 500 feet above ground level for visual approaches’.

The operations manual also required an NDB/DME approach to be flown using raw data.[13] A runway aligned GPS-based approach was available at Kosrae. At the time of the occurrence, the operator had established operational procedures for the use of GPS as the primary navigational aid for GPS-based approaches,[14] but the Civil Aviation Safety Authority had not authorised the operator to conduct RNAV (GPS) approaches.

The flight crew training manual (FCTM) specified that an approach was considered stabilised only when a number of criteria were met. Notably, these included:

  • the aircraft requiring only small changes in heading and pitch to maintain the correct flight path
  • the aircraft being in the correct landing configuration
  • all briefings and checklists having been conducted.

It also stated that unique approach procedures or abnormal conditions resulting in a deviation from the above elements required a special briefing. This was the case with the Kosrae approach, which required the flight crew to use a ‘dive and drive’[15] technique due to the unique structure of the approach, and then circling to align the aircraft to the landing runway.

The FCTM also contained recommended procedures for the conduct of circling approaches. The FCTM procedures included that the circling approach be conducted with the aircraft configured with landing gear down and flap 15 selected. The aircraft was required to be in the final landing configuration before the aircraft was established on final approach.

The captain assessed that, due to the need to conduct circling manoeuvring following the approach, there was a need for a special briefing. The approach required pitch and power changes due to the need to manoeuvre the aircraft from the missed approach point of the instrument approach to a point where the aircraft would be aligned with the runway for the final approach to landing. The manoeuvring was the result of the offset between the instrument approach course and the runway. There was also the requirement that this manoeuvring be conducted as a visual segment, and the consideration that the visual slope guidance would only provide useable information once the aircraft was aligned with the runway.

The circling approach procedure resulted in the delayed selection of flap 25 until the aircraft was at 740 ft (altimeter) and landing flap not being selected during the approach. The crew reported initially gaining visual reference with the runway environment at 900 ft. While the aircraft did not meet the operator’s stabilised approach criteria, the unique nature of the circling approach and the captain’s special briefing removed the need for strict compliance with these requirements.

Meteorological information

Sunset at the Marshall Islands Airport (departure aerodrome) was 0652 with the end of civil twilight at 0715. Sunset at Kosrae Airport was 0723 with the end of civil twilight 0745.

The terminal forecast for Kosrae held by the flight crew was issued on 11 June at 2339 UTC. It covered the period of 12 June from 0000 to 2400 UTC and stated the wind direction as 80° at 7 kt, visibility greater than 6 statute miles and showers in the vicinity of the aerodrome (not at the aerodrome, but between 5 to 10 statute miles from the aerodrome). The weather forecast provided to the flight crew did not require an alternate to be planned; however, the flight crew reported carrying sufficient fuel for a diversion to Nauru.

An aerodrome weather report (METAR) for Kosrae was issued on 12 June at 0750 UTC, approximately 70 minutes prior to the aircraft arriving overhead Kosrae. It stated the wind direction as 80° at 10 kt, visibility greater than 10 statute miles. It also stated that cloud was scattered at 1,500 ft and broken at 13,000 ft. The METAR did not include a trend forecast and there was no other indication that the local weather conditions would deteriorate.

The flight crew stated that, as they approached Kosrae, the weather deteriorated rapidly. They received regular updates on the changes from the Kosrae flight information services (FIS). During the approach, visibility began to fluctuate at or below 3 to 3.5 NM, the crew lost visual reference with the runway necessitating a missed approach. The flight crew reported that the FIS advised that the local barometric pressure was 29.74 in Hg (1007 hPa).

Flight data recorder information

The aircraft’s quick access recorder provided data regarding the aircraft’s pressure altimeter and the radio altimeter readings. Pressure altimeter information was sourced from the aircraft’s air data computer and was based on the standard pressure altimeter setting of 1013 hPa. A comparison of this pressure altitude information with the recorded radio altimeter information indicated that, on average during the approach, the aircraft’s height was about 120 ft lower than the pressure altimeter’s altitude reading.

Fatigue, workload and stress

Fatigue

Fatigue can have a range of adverse influences on human performance, such as slowed reaction time, decreased work efficiency, reduced motivational drive, increased variability in work performance, and more lapses or errors of omission (Battelle Memorial Institute 1998). Gawron, French, and Funke (2001) contend mental, or cognitive, fatigue is more central to performance degradation than physical fatigue. They state that cognitive fatigue can be ‘inferred from decrements in performance on tasks requiring alertness and the manipulation and retrieval of information stored in memory.’ (p. 581).

Researchers (see Staal, 2004, for a review) have identified that visual scanning and attentional processes have been shown to be particularly sensitive to disruption from performance degradation due fatigue. In addition, most people generally underestimate their level of fatigue.

Sleep is vital for recovery from fatigue, with both the quantity and quality of sleep being important. It is generally agreed that most people need at least 7 to 8 hours of sleep each day to achieve maximum levels of alertness and performance. Some research has concluded that less than 5 hours sleep in the previous 24 hours is inconsistent with a safe system of work (Dawson and McCullough 2005) whereas other research has shown that having less than 6 hours sleep affects performance (Thomas and Ferguson 2010, Williamson and others 2011).

At the time of the occurrence, the operator managed fatigue through the processes of flight hour and duty time limitations as required under Civil Aviation Orders 48.0 and 48.1. The operator had developed a fatigue risk management system, however, it was in a draft stage and not approved for use by the Civil Aviation Safety Authority.

Workload and stress

Dismukes and Berman (2010) conducted research on flight crew checklist use and monitoring behaviour. These researchers found that most instances of failure to monitor the aircraft state or position resulted from competing concurrent task demands on the crew’s attention. Humans have a limited ability to divide attention among tasks and generally have to switch attention back and forth between tasks. This leaves an individual vulnerable to losing track of the status of one task while being engaged in another.

Workload has been defined as ‘reflecting the interaction between a specific individual and the demands imposed by a particular task. Workload represents the cost incurred by the human operator in achieving a particular level of performance’ (Orlady and Orlady, 1999, p.203). An individual has a finite set of mental resources they can assign to a set of tasks. These resources can change given the individual’s experience and training and the level of stress being experienced at the time. An individual will seek to perform at an optimum level of workload by balancing the demands of their tasks. When workload becomes excessive the individual must, as a result of their finite mental resources, shed tasks.

Under conditions of stress, an individual’s attention will channel or tunnel. Focus on peripheral tasks will be reduced and centralised on to main tasks. What differentiates a main task from a peripheral task depends on what the individual perceives to be of greatest importance or greatest salience. Tunnelling of attention can result in either enhanced performance or reduced performance, depending on the nature of the task and the situation. ‘When peripheral cues are irrelevant to task completion the ability to tune them out is likely to improve performance. On the other hand, when these peripheral cues are related to the task and their incorporation would otherwise facilitate success on the task, performance suffers when they are unattended’ (Staal, 2004, p.31).

Emotional states have been described as providing a third processing layer on top of cognitive and physiological levels. ‘Emotions play an important role in motivating people to initiate and maintain a task in the first place, but they may also interfere with cognitive processing. In particular, under time pressure or threatening conditions, the regulation of our emotions is critical for efficient task performance’ (Gaillard, 2001, p.626).

Research on risk associated with approach and landing

In the late 1990s, the Flight Safety Foundation established the Approach and Landing Accident Reduction (ALAR) task force. The task force was commissioned to, among other things, identify common factors in approach and landing accidents and serious incidents involving turbine powered aircraft of a weight greater than 5,700 kg, and develop processes and guidance to aid operators in the reduction of these types of occurrences.

The ALAR task force identified a number of factors that were significant and common to approach and landing accidents and serious incidents. Some of these factors were also present in this occurrence, including an approach in instrument meteorological conditions (IMC), at night, in an environment where radar was not available, and where the flight crew use a non-precision instrument approach procedure.

The guidance material produced by the task force included the ALAR Risk Awareness Tool (RAT). Designed to increase flight crew’s awareness of factors that can increase the risk of an accident during approach and landing, the RAT is designed to be integrated into the approach briefing normally conducted before commencement of the descent. There were a number of factors from the RAT that identified an elevated level of risk associated with the occurrence approach. These included:

  • no ATC approach service or airport tower service
  • non-precision approach, especially with a step down procedure or circling procedure
  • visual approach in darkness
  • hilly or mountainous terrain
  • visibility restrictions, such as darkness or instrument meteorological conditions.

The RAT also makes the following point:

Greater risk is associated with conducting a nonprecision approach rather than a precision approach, and with conducting an approach in darkness and in IMC rather than in daylight and in VMC. The combined effects of two or more of these risk factors must be considered carefully.

The RAT also promotes the use of the missed approach or go-around manoeuvre when the safety of the approach or landing has become marginal, stating that ‘[f]ailure to recognize the need for a missed approach and to execute a missed approach is a major cause of approach-and-landing accidents’.

Related occurrences

ATSB investigation AO-2014-065 - incorrect configuration

On 31 March 2014, an Airbus A320 departed Auckland, New Zealand for a scheduled passenger flight to Gold Coast, Queensland. On departure from Auckland, where the local QNH was 1025 hPa, the crew selected the standard atmospheric pressure of 1013 hPa on the altimeters during climb to flight levels.

During the cruise, about 15 minutes prior to commencing the descent for the Gold Coast, the crew obtained the automatic terminal information service (ATIS) for Gold Coast and the captain wrote the details onto the take-off and landing data (TOLD) card, including the local barometric pressure of 1018 hPa. The crew then conducted the approach briefing, including a review of this information, which was entered into the flight management guidance computer (FMGC) for the approach.

Approaching transition altitude, the ‘BARO REF’ warning flashed, however, the captain was communicating with ATC, hence the page in the FMGC with the QNH displayed was not selected.

The captain then completed the communication with ATC and commenced the transition check by stating ‘transition’. At this time, the captain omitted to select the FMGC onto the flight plan page to display the QNH that had been entered. The first officer stated ‘set QNH 1025’ and the captain entered that into the second altimeter and the first officer entered the same value into the standby altimeter and a cross check confirmed that all three altimeters matched.

Passing about 1,000 ft AMSL, as the first officer completed the turn onto final approach, he observed the T-VASIS indicating a ‘fly-up’ profile. The radio altitude callout of 500 ft sounded and the first officer realised that the approach path was incorrect. When at about 159 ft above ground level, the EGPWS ‘TERRAIN’ warning sounded, and the first officer commenced the missed approach. The crew checked the QNH on the TOLD card and realised an incorrect QNH had been set.

International overview of go-around events

Although most go-arounds are conducted without significant problems, difficulties are experienced. As part of its detailed review of go-around issues, the French Bureau d’Enquêtes et d’Analyses pour la sécurité de l’aviation civile (BEA) (2013) conducted a survey of flight crews from several French and British airlines. Key results included:

  • About 60 per cent of pilots indicated that they had encountered difficulties during the conduct of a go-around manoeuvre. The most common difficulties were capturing the go-around altitude, auto-flight system management, aircraft configuration management, coping with modifications to the flight path on ATC request and visual scan management.
  • About 85 per cent of pilots reported that they were adequately trained in go-arounds with one engine inoperative but almost half the pilots indicated that they were not sufficiently trained for go-arounds with all engines operating.

The BEA’s analysis of the survey results stated that a key problem was:

The sudden onset of new tasks, the need to perform vital, rapid and varied manoeuvres, and the rapid changes in the numerous parameters to be managed (controlled) in a limited period of time combine to make it difficult for a crew to perform a go-around that is not controlled right from the start.

In its conclusions, the BEA stated that ‘aeroplane state awareness during go-around’ type events involved a combination of factors, including time pressure and a high workload; and the low number of go-arounds with all engines operating performed by crews, both in-flight and in the simulator. The BEA issued a significant number of recommendations to the European Aviation Safety Agency relating to go-around issues.

__________

  1. The aircraft was fitted with multiple Distance Measuring Equipment (DME) and Very High Frequency Omni Range (VOR) receivers that were able to be auto-tuned and used by the FMS for determining aircraft position.
  2. The rotational speed of the low-pressure compressor in a turbine engine.
  3. Aircraft navigation was to be made by sole reference to the NDB bearing and distance information from the DME. The operations manual also contained a requirement that, where the approach procedure was not contained within the flight management computer’s database, both pilots’ navigation displays were to be in the manual mode (a basic compass type display with limited navigational information from the flight management computers). The procedure used during the incident flight was contained within the database, and this requirement was not applicable.
  4. Although VH-NLK did not have GPS navigation equipment, two other aircraft in the operator’s fleet had been retro-fitted with navigation GPS equipment.
  5. Refers to the method by which an approach is flown where there are one or more stepdown fixes with minimum descent altitudes before the aircraft arrives at the missed approach point. The ‘dive and drive’ technique involves descending the aircraft to the segment’s lowest altitude then levelling off until the next stepdown point is reached. The technique involves multiple attitude and power changes during the approach, and is not consistent with the stabilised approach criteria, which can be achieved using a continuous descent profile.

Safety issues and actions

The safety issues identified during this investigation are listed in the Findings and Safety issues and actions sections of this report. The Australian Transport Safety Bureau (ATSB) expects that all safety issues identified by the investigation should be addressed by the relevant organisation(s). In addressing those issues, the ATSB prefers to encourage relevant organisation(s) to proactively initiate safety action, rather than to issue formal safety recommendations or safety advisory notices.

Depending on the level of risk of the safety issue, the extent of corrective action taken by the relevant organisation, or the desirability of directing a broad safety message to the [aviation, marine, rail - as applicable] industry, the ATSB may issue safety recommendations or safety advisory notices as part of the final report.

The initial public version of these safety issues and actions are repeated separately on the ATSB website to facilitate monitoring by interested parties. Where relevant the safety issues and actions will be updated on the ATSB website as information comes to hand.

Elevated risk from non-precision approach with low-level circling and non-stabilised approach procedure

Safety issue: AO-2015-066-SI-01

The operator commenced regular public transport operations into Kosrae with the only instrument approach available for use being an offset procedure based on a non-precision navigation aid. The risk associated with this type of approach was amplified due to the need to use a 'dive and drive' style technique instead of a stable approach path, and that it required low level circling manoeuvring from the instrument approach to align the aircraft with the runway. Furthermore, there was very high terrain in close proximity to the runway and the airport did not have a manned air traffic control tower. For this occurrence, the risk was further elevated as a result of the approach being conducted at night-time in poor weather conditions.

Additional safety action

Whether or not the ATSB identifies safety issues in the course of an investigation, relevant organisations may proactively initiate safety action in order to reduce their safety risk. The ATSB has been advised of the following proactive safety action in response to this occurrence.

Proactive safety action taken by: Nauru Airlines

On 18 September 2017, Nauru Airlines stated that they had addressed the recommendations they had made as part of their internal investigation report into the occurrence. The actions taken appear below:

  • A review of the cyclic training program was undertaken by the Flight Standards Manager (FSM) with a focus on providing more flight crew training time to enable skill levels associated with non-standard/non-routine activities to be enhanced. The FSM has re-written the simulator program, changing it to two days twice a year in lieu of one day four times a year. This will provide flight crew with at least two full days of training instead of trying to fit training and checking in during a four-hour session. The training program has been drafted, but not yet implemented.
  • A review of the descent and approach checklist card type, content and location was completed. A control column checklist incorporating tactile indicators was put into operation within weeks of the event.
  • Two engine go-around training was included in the first simulator session following the event. This continues to be covered regularly.
  • Performance based navigation (PBN) ground schools have reminded crew of QNH setting requirements. In addition, a pilot notice was issued to remind crew of the QNH validity period (15 minutes).
  • A review of the options available for the most appropriate time to set the transition altitude QNH setting was undertaken soon after the event. The review identified that there is no foolproof method, and that this was a problem with most airlines. It was decided to stay with the current policy but increase training and checking of this procedure.
  • For all flight standards meetings conducted after the event, discussions on events that could arise from not setting QNH at the transition altitude have been included. Also included are, discussions of different transition altitudes on the company network and the different types of terrain that could be encountered in the airline’s current and future network of operations. Terrain considerations are now mentioned in the operations manuals and will be incorporated in the new route manual.
  • A review of the human factors and non-technical skills (HF-NTS) course content to include relevant points from this event into the applicable modules has been assigned.
  • Soon after the event, additional emphasis was placed on the importance of correct briefing and NTS in line checks. This is now being carried out during line and simulator checks.

Purpose of safety investigations & publishing information

Purpose of safety investigations

The objective of a safety investigation is to enhance transport safety. This is done through: 

  • identifying safety issues and facilitating safety action to address those issues
  • providing information about occurrences and their associated safety factors to facilitate learning within the transport industry.

It is not a function of the ATSB to apportion blame or provide a means for determining liability. At the same time, an investigation report must include factual material of sufficient weight to support the analysis and findings. At all times the ATSB endeavours to balance the use of material that could imply adverse comment with the need to properly explain what happened, and why, in a fair and unbiased manner. The ATSB does not investigate for the purpose of taking administrative, regulatory or criminal action.

Terminology

An explanation of terminology used in ATSB investigation reports is available here. This includes terms such as occurrence, contributing factor, other factor that increased risk, and safety issue.

Publishing information

Released in accordance with section 25 of the Transport Safety Investigation Act 2003

Published by: Australian Transport Safety Bureau

© Commonwealth of Australia 2018

image_5.png

Ownership of intellectual property rights in this publication

Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this report publication is owned by the Commonwealth of Australia.

Creative Commons licence

With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence.

Creative Commons Attribution 3.0 Australia Licence is a standard form licence agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work.

The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you wish to use their material, you will need to contact them directly.

Occurrence summary

Investigation number AO-2015-066
Occurrence date 12/06/2015
Location Kosrae International Airport, Federated States of Micronesia
State International
Report release date 16/03/2018
Report status Final
Investigation level Systemic
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Aviation
Aviation occurrence category Flight below minimum altitude
Occurrence class Serious Incident
Highest injury level None

Aircraft details

Manufacturer The Boeing Company
Model 737-33A
Registration VH-NLK
Serial number 23635
Aircraft operator Air Nauru
Sector Jet
Operation type Air Transport High Capacity
Departure point Majuro, Republic of the Marshall Islands
Destination Kosrae, Federated States of Micronesia
Damage Nil

Collision between Jag Arnav and Total Response, off Bunbury, Western Australia, on 23 June 2015

Final report

Safety summary

What happened

On 23 June 2015, in daylight with clear visibility, the bulk carrier Jag Arnav and fast utility vessel Total Response collided about 26 NM north-west of Bunbury, Western Australia. Jag Arnav sustained minor damage and no injuries to the crew. Total Response sustained structural damage to its bow and deck, and two crew members received lacerations and abrasions. Both vessels were able to resume their passage.

What the ATSB found

The ATSB found that a proper and effective lookout by all available means as required by the regulations was not being maintained on either vessel.

The investigation found that Total Response’s unqualified deckhand was performing the duties of deck watchkeeper without adequate supervision. Jag Arnav was not detected by anyone on board Total Response and consequently, no avoiding action was taken. The investigation considered it likely that the chief mate and deckhand on board Total Response were at least in a state of reduced alertness attributable to environmental factors including workload prevalent on the day.

The investigation also identified that Jag Arnav’s officer of the watch, the third officer, did not maintain an effective lookout despite various electronic aids to navigation detecting Total Response. The third officer reported visually detecting Total Response, but incorrectly assessed the vessel to be passing clear. No use was made of other available means such as radar or automatic identification system to confirm the assessment and determine risk of collision. Therefore, no action was taken to avoid collision with Total Response.

What's been done as a result

The owner of Jag Arnav, the Great Eastern Shipping Company, advised that it has circulated its report into the collision to other ships that they manage and will provide additional training for navigation officers. The company has also emphasised their requirements as laid out in its safety management system with regard to the use of radar for position fixing, acquiring observed targets, use of automatic target acquisition and the use of radar overlay on the electronic chart display and information system.

Safety message

Over the past 28 years, the ATSB or its predecessors have investigated 38 collisions between trading ships and small vessels on the Australian coast. These investigations have found that failure to keep a proper and effective lookout and to take early and effective avoiding action are recurring contributing factors to these collisions. This was again highlighted by this accident.

The detection of other vessels is the first step in assessing the risk of a collision and taking avoiding action. Systematic visual observations and active use of electronic equipment designed to detect and monitor other vessels can reduce the risk of vessels going undetected or the risk of a collision being incorrectly assessed. Early detection, monitoring and correct assessment of the risk of a collision ensures that timely and appropriate avoiding action can be taken.

Appendices

Appendix A – Collision Regulations

Rules applicable to this accident as taken from the Convention on the International Regulations for Preventing Collision at Sea, 1972 (COLREGS).

Rule 5 - Look-out

Every vessel shall at all times maintain a proper look-out by sight and hearing as well as by all available means appropriate in the prevailing circumstances and conditions so as to make a full appraisal of the situation and of the risk of collision.

Rule 15 - Crossing situation

When two power-driven vessels are crossing so as to involve risk of collision, the vessel which has the other on her own starboard side shall keep out of the way and shall, if the circumstances of the case admit, avoid crossing ahead of the other vessel.

Rule 16 - Action by give-way vessel

Every vessel which is directed to keep out of the way of another vessel shall, so far as possible, take early and substantial action to keep well clear.

Rule 17 - Action by stand-on vessel

(a) (i) Where one of two vessels is to keep out of the way the other shall keep her course and speed.

(ii) The latter vessel may however take action to avoid collision by her manoeuvre alone, as soon as it becomes apparent to her that the vessel required to keep out of the way is not taking appropriate action in compliance with these Rules.

(b) When, from any cause, the vessel required to keep her course and speed finds herself so close that collision cannot be avoided by the action of the give-way vessel alone, she shall take such action as will best aid to avoid collision.

(c) A power-driven vessel which takes action in a crossing situation in accordance with sub-paragraph (a) (ii) of this Rule to avoid collision with another power-driven vessel shall, if the circumstances of the case admit, not alter course to port for a vessel on her own port side.

(d) This Rule does not relieve the give-way vessel of her obligation to keep out of the way.

Context

Jag Arnav

Jag Arnav was a 229 m long bulk carrier registered in India and classed with Class NK. The ship was owned and managed by the Great Eastern Shipping Company (GESC), India. Its crew of 24 Indian nationals had joined the ship 1 month before the collision when GESC had taken delivery of the new ship from a shipyard in the Philippines.

The ship’s master held a master’s certificate of competency. He had 8 years of seagoing experience, the last five with GESC, and had been sailing as a master for 12 months.

The third officer had 18 months of seagoing experience, including his time as a deck cadet, all of it with GESC. Jag Arnav was his first ship as a deck officer after obtaining a second mate’s certificate of competency. During the 3 weeks at sea after sailing from the Philippines, he had kept navigational watches under the supervision of the master or chief mate as per GESC procedures for new deck officers.

Jag Arnav was equipped with all the navigational equipment required by the International Convention for the Safety of Life at Sea (SOLAS)[13] for a new ship of its size. The equipment included an electronic chart display and information system as the primary means of navigation (with paper nautical charts provided as back-up) and two radars. Both radars had automatic radar plotting aid and automatic target acquisition capability as well as data input from the automatic identification system (AIS) and GPS units. Jag Arnav was also fitted with a voyage data recorder (VDR)[14] and a bridge navigational watch alarm system.

GESC established a Quality, Safety and Environment Protection System throughout its fleet in accordance with the International Management Code for the Safe Operation of Ships and for Pollution Prevention (ISM Code).[15] This safety management system (SMS) comprised clearly defined policies and procedures that were documented and compiled in the form of manuals. The Fleet Operations Manual provided guidance and instructions concerning the safe navigation of the company’s ships based on relevant mandatory international regulations such as The International Regulations for Preventing Collisions at Sea, 1972, as amended (COLREGs) and the International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (The STCW Code).[16]

The STCW Code, which prescribes minimum standards relating to training, certification and watchkeeping for seafarers, comprehensively covers the subject of the lookout.[17] Both the shipboard SMS procedures and the Code allowed the officer on watch to be the sole lookout in daylight provided it is safe to do so; taking into account factors such as weather, visibility, traffic density and proximity of navigational dangers. The STCW Code also requires that assistance be readily available to be summoned to the bridge should it be required.

Total Response

Total Response was registered in Western Australia as a domestic commercial vessel and was managed by Total AMS (TAMS) in accordance with the National Standard for Commercial Vessels (NSCV).[18]

The vessel was fitted with all the navigation equipment required by the NSCV for a vessel of its class. The equipment fitted included radar, GPS, autopilot, VHF and AIS. It was also fitted with a C‑Plot 95 electronic chart plotter with inputs from GPS and AIS. A bridge navigational watch alarm system was not required for a vessel of Total Response’s class.

The NSCV required Total Response’s core manning to comprise at least an appropriately qualified master (skipper) and an engineer. If the master also held engineer qualifications, the other crew member could be ‘uncertificated’. The NSCV also required that voyage duration, area and type of operation, passenger numbers and other factors be taken into account to determine an ‘appropriate crew’ in addition to the core manning. TAMS had decided that the skipper, chief mate and deckhand was appropriate manning for the voyage from Albany to Fremantle.

The skipper was appropriately qualified for his role[19] with about 9 years at sea, with the last year with TAMS, for the most part as skipper and engineer of Total Response.

The chief mate was also qualified for his role[20] and came from a fishing background with about 38 years of seagoing experience, the last five with TAMS, mostly on tugs towing barges.

The deckhand had joined Total Response in Albany for the voyage to Fremantle with about 8 years of seagoing experience, the last three with TAMS. His position on Total Response was as ‘uncertificated crew’ with his experience largely limited to being a dredge operator with limited experience in the role of a lookout on a navigation watch.

TAMS, as part of the company’s integrated management system, established a vessel SMS that outlined the company’s expectations for managing and operating the vessel in a safe and environmentally friendly manner. The vessel SMS contained TAMS policies, procedures, checklists, forms and in addition, vessel specific procedures.

State of alertness of Total Response’s crew

In seeking to determine their state of alertness in the time leading up to the collision, the ATSB interviewed Total Response’s crew. The interviews of the skipper, chief mate and deckhand were all consistent in the assertion that they were abruptly roused by the collision.

The skipper had planned on a short rest and was asleep in the time leading up to the collision.

The chief mate’s last recollection was of being seated or possibly lying down at the seat behind the helmsman’s chair, after using his computer sometime between 1030 and 1100. The deckhand stated that he remembered getting up for a drink, but had no memories until after the collision. Neither the chief mate nor the deckhand could account for the time between their last memories and the collision.

The crew’s work/rest schedules including sleep opportunities and time of day of sleep in the days prior to the occurrence, and time-on-task, as well as the time of day and the nature of the work task were used to assess fatigue levels. That assessment indicated that all three crew members had obtained sufficient restful sleep in the days leading up to the accident.

The possibility of oxygen deprivation was also considered as a possible factor leading to sleep. However, the Western Australian Department of Transport’s report into the collision stated, that based on the cubic volume of the internal space on Total Response, three adult males would not have been affected by any noticeable lack of oxygen. The report considered it unlikely that there could have been any decrease in oxygen levels to the point where there were any detrimental health effects.

In submission, the chief mate offered carbon dioxide build-up in the wheelhouse as a possible factor. Apart from its asphyxiating effect by displacing oxygen, breathing progressively higher concentrations of carbon dioxide for prolonged periods can cause increasingly severe headaches, fatigue, elevated respiration and pulse rates, and eventually unconsciousness leading to death. While it is possible for carbon dioxide build-up due to respiration in an enclosed space to reach levels at which adverse effects may be felt, ATSB calculations indicated that it was unlikely to be a contributory factor to the collision. There were also no fumes or other unusual smells reported being experienced in the wheelhouse.

In summary, there was no evidence to suggest that sleep-related fatigue, oxygen deprivation or carbon dioxide build-up were contributing factors to the collision.

Master’s Standing Orders

Total Response’s SMS procedures detailed the master’s responsibilities with regard to ensuring continuous and effective watchkeeping. The SMS also required the master of the vessel to develop standing orders to make clear his or her requirements for the safe navigation and operation of the vessel. These orders were required to address the circumstances under which the master was to be called and other vessel specific items such as watchkeeping, reporting and work methods. The master was required to ensure that the orders were read, understood and adhered to by all crew and that they were displayed on the bridge. At the time of the accident, there was no vessel specific master’s standing orders evident.

Collision regulations

The International Regulations for Preventing Collisions at Sea, 1972, as amended (COLREGs) provide internationally agreed rules and measures to prevent collisions. The COLREGs generally apply to all vessels in all waters and include requirements for keeping a lookout, the conduct of vessels and their responsibilities in preventing collisions.

With respect to keeping a lookout, COLREGs Rule 5 – Look-out, states:

Every vessel shall at all times maintain a proper look-out by sight and hearing as well as by all available means appropriate in the prevailing circumstances and conditions so as to make a full appraisal of the situation and of the risk of collision.

Rule 5 requires that a lookout be kept not only by sight and hearing, but by all available means. These usually include radar, AIS, electronic chart display and information system, and traffic information from other sources such as radio broadcasts and ship-to-ship calls. Maintaining a proper lookout is the first step in collision prevention so that risk of collision can be assessed in sufficient time for early and appropriate action to be taken.

The COLREGs also advise that, in determining if risk of collision exists:

Such risk shall be deemed to exist if the compass bearing of an approaching vessel does not appreciably change.

The COLREGs also specify the action each vessel should take to avoid collision depending on the situation. A crossing situation is described in Rule 15 as:

When two power-driven vessels are crossing so as to involve risk of collision, the vessel which has the other on her own starboard side shall keep out of the way and shall, if the circumstances of the case admit, avoid crossing ahead of the other vessel.

In most situations, one vessel is considered the ‘give-way’ vessel and the other the ‘stand-on’ vessel. In general, the ‘give-way’ vessel is responsible for taking action first, and Rule 16 states:

Every vessel which is directed to keep out of the way of another vessel shall, so far as possible, take early and substantial action to keep well clear.

Rule 17 details the steps the ‘stand-on’ vessel is required to take. In general, it is required to take action if it becomes necessary to avoid collision as a result of the other vessel not giving way or if action is required due to some other reason. In this case, a crossing situation had developed between Total Response (the ‘give-way’ vessel) and Jag Arnav (the ‘stand-on’ vessel).

Voyage Data Recorder

The ATSB found voice recordings from the bridge microphones recorded on Jag Arnav’s VDR did not meet the required performance standard,[21] with the recording being at times unintelligible which hindered its use in determining events and the actions of those on the bridge. In addition to the poor quality of the audio recordings, the VDR contained sensor data that could not be interpreted.

__________

  1. The International Convention for the Safety of Life at Sea, 1974, as amended, International Maritime Organization (IMO), London.
  2. A voyage data recorder (VDR) is designed to collect and store data from various shipboard systems in compliance with SOLAS requirements.
  3. International Maritime Organization, International Management Code for the Safe Operation of Ships and for Pollution Prevention (ISM Code) as amended, IMO, London.
  4. International Maritime Organization, London, 2011, Standards of Training, Certification and Watchkeeping for Seafarers (STCW) Code.
  5. ibid. Chapter VIII, Part 4.1 – Principles to be observed in keeping a navigational watch, Lookout, Paragraphs 14 to 17.
  6. The NSCV is a standard for the design, construction and operation of Australian commercial vessels regulated by the Australian Maritime Safety Authority (AMSA).
  7. The skipper held a Master Class 5 Trade certificate and a Marine Engine Driver – Grade 2 certificate.
  8. The chief mate held a Master Class 4 Trade certificate and a Fourth Class Engineer certificate.
  9. International Maritime Organization (IMO), Resolution MSC.333(90), Adoption of revised performance standards for shipborne voyage data recorders (VDRs), 22 May 2012

Safety analysis

On 23 June 2015, at about 1125, Total Response and Jag Arnav collided in open waters, with good visibility, about 26 NM north-west of Bunbury, Western Australia. No action was taken by the crew of either vessel to avoid the collision. Total Response sustained structural damage and two crew members received minor injuries. Jag Arnav sustained minor damage, with no injuries to the crew.

The crew of both Total Response and Jag Arnav were required to maintain a proper lookout in accordance with Rule 5 of The International Regulations for Preventing Collisions at Sea, 1972, as amended (COLREGs). In addition to keeping a visual lookout (in the prevailing good conditions), a number of other means to help maintain a proper lookout were available on both vessels. This analysis will discuss the lookout onboard both vessels, the availability of electronic aids for supporting an effective lookout, and that state of alertness of Total Response’s crew.

Total Response’s lookout

On Total Response, only the skipper and chief mate were qualified to keep navigational watches as the deck watchkeeper. The deckhand, as ‘uncertificated crew’, could only undertake watchkeeping duties under the supervision of a qualified deck watchkeeper. When the deckhand was assigned the watchkeeping duties, the skipper believed that the chief mate remained the deck watchkeeper and was supervising the deckhand. However, the chief mate was of the understanding that he no longer held these duties and attended to other tasks. Consequently, this misunderstanding in responsibility resulted in the unqualified deckhand performing watchkeeping duties alone and unsupervised.

In addition, there were no master’s standing orders onboard, as required by the operator’s safety management system (SMS). While the ATSB could not establish if this would have influenced the outcome, it would have detailed the master’s (skipper’s) expectations for the operation of the vessel.

Shortly after taking over as deck watchkeeper, the deckhand sighted the automatic identification system (AIS) icon of a vessel (Jag Arnav) on the chart plotter. The deckhand assumed the chief mate was aware of the vessel and did not pay it any further attention or alert anyone to its presence. This removed an early opportunity to track and assess the ship for risk of collision.

Furthermore, the deckhand had only a basic understanding and knowledge of the bridge equipment including the radar, chart plotter and AIS. This meant that he could not interrogate the AIS icon himself or acquire a detected vessel on radar in order to be able to make an assessment of the risk of a collision. Total Response was equipped with several electronic means of detecting other vessels and assessing their risk of collision. Total Response’s chart plotter had a guard zone[22] function to warn of approaching vessels, but this was not in use at the time.

As Jag Arnav got closer, the skipper was resting while the chief mate remained at the table behind the deckhand. The large ship would have become increasingly visible to anyone keeping a lookout on Total Response and the vessel’s chart plotter, AIS and radar could all have been used to enhance the lookout.

The crew of Total Response had sufficient opportunity to detect Jag Arnav and take action to avoid collision. However, there was no attempt at avoiding action or communication with Jag Arnav until after the collision. The lack of supervision of the unqualified deckhand resulted in a failure to detect the inadequate and ineffective lookout being maintained, resulting in Jag Arnav not being detected by anyone on Total Response until after the collision. Furthermore, had better use been made of the chart plotter, radar and AIS, it would have likely provided prior warning of Jag Arnav’s approach and possibly alerted the crew to the developing situation.

State of reduced alertness

Total Response and Jag Arnav collided in open waters during daylight hours under conditions of good visibility and fair weather. However, no one on board Total Response saw Jag Arnav or was aware of its approach. The ATSB investigation determined that the crew’s performance was unlikely to have been affected by sleep-related fatigue, oxygen deprivation or carbon dioxide build-up.

In seeking to determine the likely state of alertness of the chief mate and deckhand on board Total Response in the time leading up to the collision, their respective workloads and environment were considered.

Mental and physical workloads both affect human performance and accident reports suggest workload is an important causal factor in many maritime accidents. Mental workload can be defined as ‘the mental effort or processing load required to undertake a task or number of tasks’.[23] Workload can be high such as when navigating in congested waters or relatively low such as when navigating a ship in open waters with little or no traffic. The relationship between workload and fatigue can be complex predominantly as both underload and overload can contribute to fatigue.[24] Underload, as with overload, is associated with low attention levels, low motivation, loss of situation awareness and the possible onset of fatigue.[25]

The chief mate, of the belief that he was no longer on watch, was likely in a relatively low workload. The deckhand was on watch, in what was essentially, a monitoring role, a task at which human sustained attention is notoriously poor. It was likely that the deckhand and chief mate were at least in a state of reduced alertness attributable to environmental factors including low social interaction, minimal traffic, a calm sea and warm day, as well as low workload, both physical and mental. It was possible that this could have led to inadvertent sleep despite sufficient prior sleep, however, this could not be established. Despite this, a reduced state of alertness would have adversely affected the deckhand and chief mate’s ability to maintain a proper lookout. This would account for their lack of awareness of Jag Arnav.

Jag Arnav’s lookout

In the time leading up to the collision, Jag Arnav’s third officer, the officer of the watch, was the sole lookout as allowed by the company’s SMS and the International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (The STCW Code). The third officer reportedly sighted Total Response about 25 minutes before and again shortly before the collision. On both occasions, he incorrectly assessed the vessel to be crossing ahead of the ship. The next time the attention of the third officer was directed to the smaller vessel approaching was just before the collision when advised by the cadet.

The third officer had available the ship’s radars with automatic radar plotting aid and automatic target acquisition capability, AIS and electronic chard display and information system (ECDIS) to supplement a visual lookout and assist with the early detection of other vessels. The ECDIS also had the ability to display AIS targets and overlay radar images over the electronic chart. However, these electronic aids and/or their functions were either not properly used or not turned on.

A review of the voyage data recorder showed that Total Response was detected on the s-band and x‑band radars about 40 minutes and 20 minutes respectively before the collision. The radar echo and AIS icon were consistently appearing on both radars indicating a rapidly closing vessel on a steady compass bearing. The lack of appreciable change in bearing indicated that there was a risk of a collision and that the vessel would not pass clear or would do so at very close range. As it got closer, Total Response would have become increasingly visible to the third officer (almost certainly if aided by binoculars).

Further, as Jag Arnav was the ‘stand-on’ vessel, the third officer was obliged to wait for Total Response, the ‘give-way’ vessel, to take action until such time that it became clear that it was not taking action, or that its action alone could not prevent collision. Once this became apparent, the third officer was obliged to take action to avoid collision. However, the third officer’s assessment of the situation was based solely on visual sightings with no use of electronic aids to confirm the assessment. The third officer (incorrectly) assessed that Total Response would pass clear, ahead of Jag Arnav with no risk of collision and therefore, no need for avoiding action.

After visually identifying the approaching vessel, a more systematic observation using other equipment such as ECDIS, radar or AIS would have allowed a more thorough assessment of the situation. This would have alerted the third officer to the developing close quarters crossing situation and the risk of a collision with Total Response. A proper lookout by all available means, as required by the SMS, the master’s standing orders and the COLREGs would have ensured that the risk of collision posed by Total Response was recognised allowing appropriate action to be taken to avoid a collision.

Collisions between ships and small vessels

Between 1990 and 2017, 63 collisions between trading ships and small vessels on the Australian coast have been reported to the ATSB or its predecessors. Of these, 38 have been investigated.[26] Failure to keep a proper and effective lookout and take early and effective avoiding action have been identified as recurring contributing factors to these collisions

The keeping of a proper and effective lookout at sea at all times is a critical aspect of collision avoidance. The detection of other vessels is the first step in assessing risk of collision and taking avoiding action. Mariners today have increasing access to navigational aids that enhance the keeping of a lookout. Technology such as ECDIS integrated with radar and AIS are common on ships, and even small vessels are increasingly being fitted with chart plotters and AIS. These aids, when used effectively, give the lookout the ability to detect other vessels well before they are in visual range. Active use of safety features such as guard rings and guard zones, automatic target acquisition functions and ECDIS overlays can reduce the risk of vessels going undetected.

Lessons from past investigations into collisions between trading ships and small vessels on the Australian coast have shown that a proper lookout using all available means and the taking of early avoiding action in accordance with the COLREGs could have prevented most collisions.

The safety lessons from these investigations have been published in ATSB investigation reports. A number of ATSB safety bulletins also highlight these risks to educate seafarers and mariners. These documents and other safety information about marine safety issues are available on the ATSB website.

__________

  1. A guard zone can be set on the chart plotter at a specified distance around a vessel and will set off an alarm when a radar target or AIS icon of a vessel enters the zone.
  2. Grech, RG, Horbery, TJ & Koester, T 2008, Human factors in the maritime domain, CRC Press, London
  3. Grech, Michelle R, Neal, Yeo GB, Humphreys M, Smith S, 2009, An examination of the relationship between workload and fatigue within and across consecutive days of work: is the relationship static or dynamic? Journal of Occupational Health Psychology, 14(3). pp. 231-242.
  4. Grech, Working onboard: workload, stress and communication, Human Performance and limitation for mariners, 2015, London: The Nautical Institute, pp. 53-67.
  5. ATSB investigation MO-2017-007 started on 13 August 2017 was ongoing at the time of finalising the MO-2015-003 report.

Sources and submissions

Sources of information

The sources of information during the investigation included the:

  • interviews of the crew of Total Response and employees of the management company, Total AMS (TAMS).
  • documents as supplied by TAMS
  • statements, from the crew of Jag Arnav, and other information provided by Jag Arnav’s management company, Great Eastern Shipping Company
  • electronic information taken from the electronic chart plotter of Total Response
  • electronic information taken from the voyage data recorder of Jag Arnav
  • documentation supplied by the Western Australian Department of Transport.

References

International Maritime Organization, 1972, International Regulations for Preventing Collisions at Sea, 1972 as amended (COLREGs), IMO, London. Information available at: www.imo.org/en/About/Conventions/ListOfConventions/Pages/COLREG.aspx.

International Maritime Organization, The International Convention for the Safety of Life at Sea (SOLAS) 1974 as amended, IMO, London.

International Maritime Organization, The International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (STCW), 1978, as amended, IMO, London.

International Maritime Organization, 1995, International Management Code for the Safe Operation of Ships and for Pollution Prevention (ISM Code) as amended, IMO, London.

International Maritime Organization, 1997, Resolution A.861(20) Performance Standards for Shipborne Voyage Data Recorders, IMO, London.

International Maritime Organization, 2012, MSC.333(90) Adoption of Revised Performance Standards for Shipborne Voyage Data Recorders (VDRs), IMO, London. Available at: www.imo.org/en/KnowledgeCentre

International Chamber of Shipping, 2016, Bridge Procedures Guide, Marisec Publications, London.

United Kingdom Hydrographic Office (UKHO), 2015, The Mariner’s Handbook, Tenth Edition, UKHO, Taunton, England.

Australian Maritime Safety Authority, 2012, The Marine Safety (Domestic Commercial Vessel) National Law Act 2012 (National Law), Australian Government, Canberra. Information available at: www.legislation.gov.au/Details/C2012A00121

Australian Maritime Safety Authority, 2012, National Standards for Commercial Vessels, AMSA, Canberra. Information available at: www.amsa.gov.au/about-national-system

Grech, RG, Horbery, TJ & Koester, T 2008, Human factors in the maritime domain, CRC Press, London

Grech, Working onboard: workload, stress and communication, Human Performance and limitation for mariners, 2015, London: The Nautical Institute.

Grech, Michelle R, Neal, Yeo GB, Humphreys M, Smith S, 2009, An examination of the relationship between workload and fatigue within and across consecutive days of work: is the relationship static or dynamic? Journal of Occupational Health Psychology.

Submissions

Under Part 4, Division 2 (Investigation Reports), Section 26 of the Transport Safety Investigation Act 2003 (the Act), the Australian Transport Safety Bureau (ATSB) may provide a draft report, on a confidential basis, to any person whom the ATSB considers appropriate. Section 26 (1) (a) of the Act allows a person receiving a draft report to make submissions to the ATSB about the draft report.

A draft of this report was provided to the Australian Maritime Safety Authority, Western Australian Department of Transport, the master, mate and deck hand of Total Response, Total AMS, the master and third officer of Jag Arnav and the Great Eastern Shipping Company.

Submissions were received from the Australian Maritime Safety Authority and Total Response’s chief mate. The submissions were reviewed and where considered appropriate, the text of the report was amended accordingly.

Findings

From the evidence available, the following findings are made with respect to the collision between the fast utility vessel, Total Response, and the bulk carrier, Jag Arnav, that occurred in daylight in good visibility and in open waters off Bunbury, Western Australia on 23 June 2015. These findings should not be read as apportioning blame or liability to any particular organisation or individual.

Contributing factors

  • A proper lookout, in accordance with The International Regulations for Preventing Collisions at Sea (COLREGs), was not maintained on board Total Response. No one, including the deckhand acting as watchkeeper, saw Jag Arnav or was aware of its approach.
  • Leading up to the collision, the responsibility for the supervision of the unqualified deckhand's watchkeeping activities, by a qualified deck watchkeeper, was not clearly established on board Total Response.
  • In the time leading up to the collision, it is likely that the chief mate and deckhand on board Total Response were at least in a state of reduced alertness attributable to the environmental factors, including the low mental and physical workload prevalent on the day, which may have influenced the effectiveness of the lookout.
  • A proper lookout by all available means, in accordance with the company procedures, master’s standing orders and COLREGs, was not maintained on board Jag Arnav. The third officer incorrectly assessed that Total Response would pass clear based on a visual sighting and made no use of electronic aids such as radar or automatic identification system to determine if risk of collision existed.

Other factors that increased risk

  • Jag Arnav’s voyage data recorder contained sensor data that could not be interpreted and poor quality audio recordings that did not meet the required International Maritime Organization performance standards.
  • At the time of the collision, there were no master's standing orders present on board Total Response as required by the company’s safety management system.

The occurrence

On 20 June 2015, at about 1900 Western Standard Time,[1] the 19.9 m long fast utility vessel, [2] Total Response (Figure 1), sailed from Albany, Western Australia bound for Fremantle. The vessel’s crew comprised the skipper, chief mate and deckhand. The skipper and chief mate were to share the deck watchkeeper duties for the expected 20-hour passage.

During the passage, the vessel encountered adverse weather. The skipper diverted the vessel to Augusta and moored there to wait out the weather.

Figure 1: The fast utility vessel, Total Response

Figure 1: The fast utility vessel, Total Response. Source: Total AMS (TAMS)

Source: Total AMS (TAMS)

Whilst laid up at Augusta, waiting for the adverse weather to subside, Total Response’s crew carried out routine maintenance. On 23 June, at about 0430, Total Response departed Augusta. The skipper navigated the ship out of the harbour and remained in the wheelhouse as deck watchkeeper.

At about 0700, the chief mate took over the duties of deck watchkeeper from the skipper. The deckhand joined them in the wheelhouse and the three men made light conversation. The weather and visibility were good with a light (5 knots) south-easterly wind. By about 0920, Total Response had rounded Cape Naturaliste for the final leg of its passage toward Fremantle. The auto-pilot was set on a heading of 027º and the vessel was making good about 16 knots.[3]

At about 1000, the chief mate and skipper decided to give the deckhand the opportunity to act as deck watchkeeper to aid in the deckhand gaining experience towards a deck watchkeeper qualification. The chief mate handed over the watch to the deckhand who took up the seat at the helm console (Figure 2). The chief mate moved to the table behind the deckhand and began using his laptop computer. The skipper was seated at the table on the other side of the wheelhouse.

Meanwhile, Jag Arnav was near the coast to the east of Total Response. The 229 m long bulk carrier had just sailed from Bunbury (Figure 3) for the United Arab Emirates. The master, third officer and a duty seaman were on the ship’s navigation bridge (bridge).

Figure 2: Locations of personnel in Total Response's wheelhouse

Figure 2: Locations of personnel in Total Response's wheelhouse. Source: TAMS, annotated by the ATSB
Source: TAMS, annotated by the ATSB

At about 1012, Jag Arnav’s master ordered a heading of 317° and increased speed to 12 knots for the sea passage. The ship was placed on auto-pilot and the visibility was ‘good’ (greater than 6 NM). The x-band[4] radar was set to a 6 NM range scale and the s-band[5] radar to a 12 NM range scale. The master handed over navigational responsibilities to the third officer who was the officer of the watch and switched on the bridge navigational watch alarm system.[6]

At about 1030, the master dismissed the duty seaman from the bridge and instructed him to go on deck and help the crew secure the ship for sea.

At about 1042, an alarm on the x-band radar was activated by a spurious radar echo. The alarm was acknowledged, but there were no radar targets on either radar’s display at that time.

Shortly after 1044, a faint target echo appeared on the s-band radar display on a true bearing of 251º at a distance of about 12 NM. Over the next 5 minutes, the echo became stronger and its ‘target trail’[7] became evident. The target echo was that of Total Response. No attempt was made by the third officer to acquire or track the target and neither radar’s automatic target acquisition[8] function was turned on at the time.

Meanwhile, in Total Response’s wheelhouse, the skipper told the deckhand to keep the vessel on the track displayed on the chart plotter[9] located near the helm console. The skipper also told the deckhand ‘not to touch anything, to keep a lookout and call him if he had any problems’. He then retired to his seat to rest. The chief mate had finished using his computer and remained at the table behind the deckhand. Shortly after taking over the watch from the chief mate at 1000, the deckhand observed the automatic identification system[10] (AIS) icon of a vessel near the coast on the chart plotter display. The deckhand did not report this to the chief mate or the skipper as he assumed the chief mate was already aware of it.

Figure 3: Section of navigational chart Aus 334 showing the tracks of both vessels

Figure 3: Section of navigational chart Aus 334 showing the tracks of both vessels. Source: Australian Hydrographic Service, annotated by the ATSB using electronically recorded data

Source: Australian Hydrographic Service, annotated by the ATSB using electronically recorded data

At about 1100, Jag Arnav’s s-band radar indicated Total Response’s target echo on a 251º bearing at a distance of 7.4 NM. By this time, Total Response’s AIS icon had also appeared on the radar display. The third officer reported he sighted a vessel at about the same time on a bearing of about 4 points[11] on the port bow. Based on his visual observations, the third officer assessed the vessel would pass clear ahead of Jag Arnav and therefore maintained Jag Arnav’s course and speed. The third officer also fixed the ship’s position on the paper navigational chart and continued to do so at 5-minute intervals until the collision.

Shortly after, at about 1103, Total Response’s radar echo and AIS icon also appeared on the x‑band radar display (Figure 4).

At about 1112, Total Response was 4 NM away from Jag Arnav and still on a bearing of 251º. The vessel’s radar echo, trail and AIS icon were conspicuous on both of the ship’s radar displays. Neither radar’s automatic radar plotting aid[12] function was used to track Total Response.

At 1119, Total Response was about 2 NM away on the same steady bearing. The vessel had maintained its course and speed with the deckhand seated at the helm console. The chief mate was still situated behind the deckhand while the skipper rested on the seat on the other side of the wheelhouse.

Figure 4: Images of Jag Arnav's s-band (L) and x-band (R) radars at 1103

Figure 4: Images of Jag Arnav's s-band (L) and x-band (R) radars at 1103. The images show Jag Arnav’s s-band radar set on a 12 NM range scale and the x-band radar set on a 6 NM range scale. 
Source: Jag Arnav’s voyage data recorder (VDR), annotated by the ATSB

The images show Jag Arnav’s s-band radar set on a 12 NM range scale and the x-band radar set on a 6 NM range scale. Source: Jag Arnav’s voyage data recorder (VDR), annotated by the ATSB

On board Jag Arnav, the third officer reported sighting Total Response again just before the collision on a bearing of about 2 points on the port bow and again assessed the vessel to be passing clear ahead of Jag Arnav. At about 1124, the deck cadet working on the port side of the main deck noticed Total Response off the port beam, closing on the ship. He called the bridge using a handheld radio and reported the rapidly approaching vessel to the third officer who was near the chart table.

At about 1125, as the third officer acknowledged the cadet’s radio call, Total Response collided with Jag Arnav near its number two cargo hold on the port side. The master had also heard the radio call and had gone to the port bridge wing where he saw Total Response close astern. Realising there had been a collision, he took over from the third officer and began manoeuvring the ship to assist the vessel if required.

The force of the impact was such that the deckhand, chief mate and skipper of Total Response were thrown from their positions. Woken suddenly, the skipper quickly took over the vessel’s controls and manoeuvred clear of the ship. He then checked on his crew and found both the chief mate and deckhand had suffered abrasions and lacerations, including to their heads.

Shortly afterwards, the master of Jag Arnav established VHF radio contact with Total Response’s skipper and they exchanged information. After inspecting the vessel, the skipper confirmed that no assistance was required. Total Response’s bow had been damaged, but the hull was intact. Water was entering the engine room via the stern tube of the port propeller shaft and a bilge pump was used to pump it out.

At about 1156, Total Response’s skipper resumed its passage to Fremantle.

Jag Arnav’s crew inspected its hull, including cargo holds and tanks. No structural damage, other than a small indent where the vessel had impacted the hull, was found. At about 1445, after completing the necessary incident reporting, Jag Arnav’s master resumed its voyage.

__________

  1. All times referred to in this report are local time, Coordinated Universal Time (UTC) + 8 hours.
  2. A vessel used for, amongst other things, crew transfers and supplying provisions and stores.
  3. All speeds referred to in this report are ‘made good/over the ground’.
  4. An x-band radar operates at a frequency of 10 GHz and its fine resolution makes it useful for collision avoidance.
  5. An s-band radar operates at a frequency of 3 GHz and is better at penetrating through weather such as rain or fog.
  6. A mandatory system, the bridge navigational watch alarm system (BNWAS) automatically alerts the master or another qualified officer if the officer of the watch becomes incapable of performing the officer of the watch’s duties for any reason such as falling asleep or becoming otherwise incapacitated.
  7. The target trail function indicates the historical track of a radar target (settings include true or relative track and the historical time period).
  8. Automatic target acquisition is an optional function that allows radar targets to be automatically acquired and plotted based on the user’s pre-set parameters.
  9. A device used in marine navigation that integrates GPS data with an electronic navigational chart. It displays the electronic chart along with the position, heading and speed of the ship.
  10. The automatic identification system (AIS) is a very high frequency (VHF) radio broadcasting system which enables AIS equipped vessels and shore-based stations to send and receive identifying information.
  11. One point of the compass equals 11.25 degrees.
  12. A radar with automatic radar plotting aid (ARPA) capability automatically tracks, processes, displays and continuously updates information on manually or automatically acquired radar targets.

Safety issues and actions

Additional safety action

Whether or not the ATSB identifies safety issues in the course of an investigation, relevant organisations may proactively initiate safety action in order to reduce their safety risk. The ATSB has been advised of the following proactive safety action in response to this occurrence.

Great Eastern Shipping Company

In response to the accident, the Great Eastern Shipping Company advised the ATSB that they have taken the following actions:

  • Distributed a circular to company’s vessels advising them of the accident and the factors that led to it.
  • Distributed a circular to company’s vessels re-emphasising the requirement that all company standard operating procedures are always followed when a vessel proceeds to sea. Specifically:
    • Any target once observed needs to be acquired on the radar.
    • The auto target acquisition of both the radars is to be switched on after pilotage and after clearing port limits.
    • Position fixing is to utilise other means such as radar and not rely solely on GPS.
  • Instructions have been provided to masters to ensure that the officer on watch is competent and able to keep independent bridge watches during daylight hours with good visibility and low traffic before handing over the ‘Con’ and dismissing the helmsman from the bridge.
  • At the time of the accident, the company’s safety management system (SMS) stated that the primary means of navigation were paper charts. The SMS was amended to state that, if fitted, certified and part of a vessel’s safety equipment, an electronic chart display and information system (ECDIS) would be the primary means of navigation. Paper charts provided as a back‑up for the ECDIS were also to be kept updated as per the company’s SMS.
  • ECDIS was to be used with the available radar overlay when in use.
  • Additional training was to be provided to all navigation officers to prevent such occurrences.

Purpose of safety investigations & publishing information

Purpose of safety investigations

The objective of a safety investigation is to enhance transport safety. This is done through:

  • identifying safety issues and facilitating safety action to address those issues
  • providing information about occurrences and their associated safety factors to facilitate learning within the transport industry.

It is not a function of the ATSB to apportion blame or provide a means for determining liability. At the same time, an investigation report must include factual material of sufficient weight to support the analysis and findings. At all times the ATSB endeavours to balance the use of material that could imply adverse comment with the need to properly explain what happened, and why, in a fair and unbiased manner. The ATSB does not investigate for the purpose of taking administrative, regulatory or criminal action.

Terminology

An explanation of terminology used in ATSB investigation reports is available here. This includes terms such as occurrence, contributing factor, other factor that increased risk, and safety issue.

Publishing information 

Released in accordance with section 25 of the Transport Safety Investigation Act 2003

Published by: Australian Transport Safety Bureau

© Commonwealth of Australia 2018

image_5.png

Ownership of intellectual property rights in this publication

Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this report publication is owned by the Commonwealth of Australia.

Creative Commons licence

With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence.

Creative Commons Attribution 3.0 Australia Licence is a standard form licence agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work.

The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you wish to use their material, you will need to contact them directly.

Occurrence summary

Investigation number 320-MO-2015-003
Occurrence date 23/06/2015
Location 48 km north-west of Bunbury
State Western Australia
Report release date 08/06/2018
Report status Final
Investigation level Systemic
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Marine
Marine occurrence category Collision
Occurrence class Accident
Highest injury level Minor

Ship details

Name Total Response
IMO number Call sign MH3168
Ship type Sea passage
Flag Australia (Western Australia)
Manager TAMS, Australia
Departure point Albany, WA
Destination Fremantle, WA

Ship details

Name Jag Arnav
IMO number 9705354
Ship type Commercial cargo - sea passage
Flag India
Manager The Great Eastern Shipping Company, India
Departure point Bunbury, WA
Destination Jebel Ali (UAE)

Flight below minimum altitude involving an Avro 146, VH-NJW, near Granny Smith Airport, Western Australia, on 23 June 2015

Final report

What happened

On 23 June 2015, at about 0420 Western Standard Time (WST), the captain and first officer of an Avro 146 aircraft, registered VH-NJW, and operated by National Jet Express, signed on to conduct a scheduled return flight from Perth to Granny Smith Airport, Western Australia (Figure1). The flight crew reviewed the weather forecast, including the aerodrome forecast (TAF)[1] for Leonora, which was the closest available TAF to Granny Smith. The TAF indicated broken[2] cloud 1,000 ft above ground level (AGL). The weather report (METAR) current at Leonora at that time indicated nil cloud detected (NCD). The forecast also included cloud at 1,500 ft AGL clearing at 0900 WST. Based on the weather forecast, the crew were required to plan for an alternate aerodrome,[3] and the captain planned sufficient fuel to return to Perth if they were unable to land at Granny Smith.

Figure 1: Selected aerodromes in Western Australia

Figure 1: Selected aerodromes in Western Australia

Source: Google earth annotated by the ATSB

The first officer conducted the take-off and climb from Perth, and handed control of the aircraft to the captain after reaching the top of climb. In accordance with company procedures, the captain was required to conduct the landing at Granny Smith airport, due to the unsealed runway surface.

When established in the cruise, the flight crew received a weather report for Laverton indicating cloud at 800 ft AGL. The first officer spoke to the aerodrome reporting officer (ARO) at Granny Smith Airport, who reported that there were patches of blue sky above the aerodrome. The flight crew elected to continue to Granny Smith. They planned to overfly the aerodrome at the lowest safe altitude of 3,300 ft above mean sea level (AMSL), and if the weather was suitable, descend and join the circuit on downwind for runway 16. If they were unable to obtain the required visual reference for the aerodrome, the crew planned to divert to Laverton Airport, and conduct an area navigation (RNAV) approach and land there. The flight crew also discussed the option of conducting an RNAV approach at Laverton and, if suitable conditions for visual flight existed, they could then transit across to Granny Smith Airport, about 9 NM south of Laverton.

When the aircraft arrived overhead Granny Smith, the conditions were overcast. The flight crew elected to divert to Laverton, and advised the ARO that if they were able to establish visual reference at Laverton they would track from there to Granny Smith. The aircraft descended to the minimum sector altitude of 3,100 ft AMSL and the flight crew conducted the RNAV approach to runway 25. The crew configured the aircraft for the approach into Laverton, selecting gear down and flap 24, prior to arrival at the initial approach fix. When about 2.5 NM from the runway threshold and at about 2,150 ft AMSL, the aircraft became clear of cloud but the captain could not see the runway ahead at Laverton. The captain then disconnected the autopilot and turned the flight director off, in accordance with the standard company procedure for conducting a visual approach.

The weather to the south towards Granny Smith was clear, so the captain elected to divert to Granny Smith and turned the aircraft towards it, with the aircraft still configured for the approach with gear down and flap 24. The flight crew were able to maintain visual contact with the ground and reported about 8 km of visibility. The first officer had set the altimeter bug to 2,130 ft prior to commencing the descent, which was the minimum descent altitude (MDA) of 2,080 ft plus 50 ft as required by the company procedures. The wind was from 160° at 12 kt, and the captain planned to establish the aircraft on a straight in approach for runway 16.

The captain observed the radio altimeter (RADALT) indicating 500 ft and the electronic ground proximity warning system (EGPWS)[4] called ‘500’, both indicating the aircraft was 500 ft AGL. Shortly afterwards, the crew received an EGPWS ‘DON’T SINK’ warning. The first officer observed the RADALT indicating 380 ft and the vertical speed indicator showing about 100 ft per minute descent. The captain immediately applied nose-up pitch and increased the thrust, in accordance with the standard response. The aircraft climbed towards cloud and the captain levelled the aircraft off to remain clear of cloud. The crew then received a second ‘DON’T SINK’ warning (see ‘Don’t Sink’ section below). The first officer noted the RADALT indicating 410 ft and the captain immediately initiated a go-around, climbing to 4,000 ft AMSL.

Due to the time spent operating with the aircraft in the approach configuration, and the possibility of holding required in Perth, the captain then elected to divert to Kalgoorlie and refuel. After arrival in Kalgoorlie, the captain contacted the company flight operations manager. The manager queried whether the captain was fit to continue to operate the aircraft, to which the captain replied in the affirmative. After communicating with the company, at about 0900, the aircraft departed and tracked to Granny Smith. The conditions were still overcast at Granny Smith Airport, and the flight crew elected to track to Laverton, and conduct the RNAV approach. When at about 2,500 ft AMSL the aircraft encountered visual meteorological conditions.[5] The flight crew then elected to track to Granny Smith Airport, where the aircraft landed. The crew subsequently conducted the return flight to Perth.

Don’t Sink

According to the flight crew operating manual (FCOM), the EGPWS Mode 3 provides protection against loss of altitude after take-off or during a go-around. The amount of altitude loss is assessed against the height of the aircraft above the terrain. If the loss of altitude becomes significant for the height, a ‘Don’t Sink, Don’t Sink’ aural alert is given and the amber (terrain) ‘TERR’ caution lights illuminate. In response to a ‘Don’t Sink’ caution, the FCOM specified one memory action: adjust the pitch attitude and thrust to restore a positive rate of climb.

Pilot comments

The captain had limited sleep in the preceding three weeks. In the 24 hours prior to signing on for duty, the captain had about three hours’ sleep. The captain reported feeling irritable, with poor concentration, heavy eyes, and slow thinking processes. The captain believed that the captain’s decision-making had been affected by lack of sleep. The captain advised the first officer prior to the flight of having had little sleep.

Both the captain and the first officer had been on leave for three weeks prior to the incident flight.

The first officer reported that they had made the decision to transit to Granny Smith, based on the understanding that a visual segment could be flown as the aircraft was within 30 NM of the aerodrome, clear of cloud and in sight of the ground with visibility greater than 5 km. However, that applied, according to Aeronautical Information Publication Australia (AIP) ENR 1.5-12 section 1.15 Visual Approaches, when the aircraft was ‘at an altitude not below the lowest safe altitude [LSALT] /minimum sector altitude [MSA] for the route segment’. The minimum sector altitude was 3,300 ft.

Flight data

The aircraft operator analysed the flight data (Figure 2). The data showed that during the transit from Laverton to Granny Smith, EGPWS ‘DON’T SINK’ alerts were triggered when the aircraft’s altitude reduced to 346 ft AGL, and again 1 minute later at 529 ft and then 520 ft AGL.

Figure 2: Plan view of the incident flight from the recorded flight data

Figure 2: Plan view of the incident flight from the recorded flight data

Source: Aircraft Operator

Safety action

Whether or not the ATSB identifies safety issues in the course of an investigation, relevant organisations may proactively initiate safety action in order to reduce their safety risk. The ATSB has been advised of the following proactive safety action in response to this occurrence.

Aircraft operator

As a result of this occurrence, the aircraft operator has advised the ATSB that they are taking the following safety actions:

Fitness to fly

The head of flying operations (HOFO) for the aircraft operator sent a notice to all company flight crew. The notice stated that fitness to fly was critical for their daily functions. The HOFO reminded flight crew that their personal health and safe operations of company aircraft were of the highest priority. Company pilots were advised not to work if they did not feel ‘up to the task’. The notice also provided contact information for the company’s recommended employee assistance program.

Safety notice

The company immediately issued an operational notice to all flight crew, titled Operations to airfields without instrument approach procedures. The notice stated the following:

On arrival at the destination, descent below the LSALT is only permitted if, within 5 NM of the airfield, conditions exist to permit a visual approach as per the runway approach profiles specified in the applicable Operations Notice or the OM-C1.

For reference, OM-A2 1.5.3 Lowest Safe Altitude

An aircraft may only be operated below the LSALT when:

Departing the prescribed circling area and operation above the MSA

Carrying out a published instrument approach

Carrying out a minimum weather circuit within the circling area and not below the circling altitude

In the process of taking off or landing in accordance with approved departure or arrival procedures

Visual conditions exist, utilising criteria laid down in the Jeppesen Airway Manual – Air Traffic Control – General Flight Procedures

Being radar vectored.

It is not permitted to conduct an instrument approach at a nearby airfield to gain visual reference, and then transit to the destination airfield below LSALT.

Safety message

The captain noted that in hindsight their decision-making was impaired by lack of sleep. Research (Thomas and Ferguson, 2010) has shown that prior sleep is a critical fatigue-related variable. Less than 6 hours’ sleep in the previous 24 hours was found to be associated with degraded operational performance and increased error rates.[6]

Civil Aviation Advisory Publication (CAAP) 48-1(1), states that ‘determining fitness for duty has always been a complex and challenging task…and substantial fatigue research has demonstrated that humans are quite poor at determining how fatigued they actually are.’ In addition, flight crewmembers ‘who are fatigued will have impaired decision-making and they will have poorer judgment in terms of how fatigued they are and whether they are actually fit for duty’.

Prior to flight, it is important for pilots to assess their fitness to fly. The following checklist provides a quick reference. A description of aeromedical factors is available in the US Federal Aviation Authority Pilot’s Handbook of Aeronautical Knowledge.

I'm Safe Checklist

Aviation Short Investigations Bulletin - Issue 43

Purpose of safety investigations

The objective of a safety investigation is to enhance transport safety. This is done through:

  • identifying safety issues and facilitating safety action to address those issues
  • providing information about occurrences and their associated safety factors to facilitate learning within the transport industry.

It is not a function of the ATSB to apportion blame or provide a means for determining liability. At the same time, an investigation report must include factual material of sufficient weight to support the analysis and findings. At all times the ATSB endeavours to balance the use of material that could imply adverse comment with the need to properly explain what happened, and why, in a fair and unbiased manner. The ATSB does not investigate for the purpose of taking administrative, regulatory or criminal action.

Terminology

An explanation of terminology used in ATSB investigation reports is available here. This includes terms such as occurrence, contributing factor, other factor that increased risk, and safety issue.

Publishing information 

Released in accordance with section 25 of the Transport Safety Investigation Act 2003

Published by: Australian Transport Safety Bureau

© Commonwealth of Australia 2015

image_5.png

Ownership of intellectual property rights in this publication

Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this report publication is owned by the Commonwealth of Australia.

Creative Commons licence

With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence.

Creative Commons Attribution 3.0 Australia Licence is a standard form licence agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work.

The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you wish to use their material, you will need to contact them directly.

__________

  1. Aerodrome Forecasts are a statement of meteorological conditions expected for a specific period of time, in the airspace within a radius of 5 NM (9 km) of the aerodrome.
  2. Cloud cover is normally reported using expressions that denote the extent of the cover. The expression few indicates that up to a quarter of the sky was covered, scattered indicates that cloud was covering between a quarter and a half of the sky. Broken indicates that more than half to almost all the sky was covered, while overcast means all the sky was covered.
  3. Alternate minima are specified weather conditions or facilities for a particular aerodrome such that, if the weather conditions or facilities are less than the alternate minima, the pilot in command must provide for a suitable alternate aerodrome.
  4. The aircraft was fitted with an integrated terrain and traffic collision avoidance system that incorporated a number of functions, including a terrain awareness warning function (TAWS), a ground proximity warning function, and a traffic alert and collision avoidance function (TCAS).
  5. Visual Meteorological Conditions is an aviation flight category in which visual flight rules (VFR) flight is permitted—that is, conditions in which pilots have sufficient visibility to fly the aircraft maintaining visual separation from terrain and other aircraft.
  6. Thomas, M.J., and Ferguson, S.A. (2010). Prior sleep, prior wake and crew performance during normal flight operations, in Aviation, space and environmental medicine, 81(7):665-70.

Occurrence summary

Investigation number AO-2015-065
Occurrence date 23/06/2015
Location near Granny Smith Airport
State Western Australia
Report release date 07/10/2015
Report status Final
Investigation level Short
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Aviation
Aviation occurrence category Flight below minimum altitude
Occurrence class Incident
Highest injury level None

Aircraft details

Manufacturer British Aerospace
Model E2329
Registration VH-NJW
Serial number E2329
Aircraft operator National Jet Express
Sector Jet
Operation type Air Transport High Capacity
Departure point Perth, WA
Destination Granny Smith, WA
Damage Nil

Windscreen fogging and collision with terrain involving a R22 helicopter, VH-RBT, near Boyup Brook ALA, Western Australia, on 23 June 2015

Final report

What happened

Early on the morning of 23 June 2015, the pilot pulled the Robinson R22 helicopter registered VHRBT from the hangar on a property about 6 NM east of Boyup Brook aeroplane landing area (ALA), and prepared for a private flight with one passenger to Jandakot, Western Australia.

Prior to commencing the flight, the pilot re-checked the area meteorological forecast (ARFOR). The ARFOR indicated the probability of low cloud with fog, west of Boyup Brook ALA. The pilot reported that it was a cold and clear morning, with calm conditions. Although there was fog in a gully, about 200-300 m down the slope from the hangar, the general area and intended flight path were completely clear (Figure 1).

At about 0650 Western Standard Time (WST), the pilot started the helicopter engine and allowed the engine to warm up. The pilot then completed final preparations for departure while waiting for first light[1]

At about 0700, just after first light, the pilot reported that the horizon and the outline of the buildings and trees were clearly visible. After broadcasting intentions on the radio, the pilot established the helicopter into a hover about 2-3ft above the ground.

Figure 1: Marks where the helicopter tail and skid struck the ground. The drain the pilot planned to clear prior to transitioning to forward flight and hangar arein the background

Figure 1: Marks where the helicopter tail and skid struck the ground. The drain the pilot planned to clear prior to transitioning to forward flight and hangar arein the background

Source: Pilot

After completing a power check, the pilot conducted a pedal turn to the east. The pilot intended to gain some height prior to transitioning the helicopter into forward flight, in order to clear the hangar and drain areas.

Due to the down-sloping terrain, the helicopter was about 15ft above the ground soon after lift-off. As the pilot began to raise the collective[2] and with their attention momentarily inside the cockpit, the passenger alerted them to the almost instantaneous external fogging of the windscreen. The pilot was briefly able to see the ground through the side window, before that also became shrouded in condensation. The pilot described this instant lack of external reference, as like being in a ‘white room’. In an attempt to keep some necessary visual reference, the pilot reached down and flipped open the small vent located in the right door. Although a snapshot of ground was visible, it was insufficient to pinpoint the helicopter’s actual position.

Now about 30-40 ft above the ground, the pilot elected to put the helicopter back on the ground. Manoeuvring slightly left to avoid the assumed position of the drain, the pilot unexpectedly felt the tail and rear skids of the helicopter strike the ground. The pilot stated this was a heavy collision, and resulted in the helicopter bouncing back into the air. The pilot applied some collective and the helicopter bounced again then yawed rapidly to the right. The pilot applied full left pedal in an attempt to prevent the helicopter from entering a spin, however the yaw continued, so the pilot rapidly reduced the throttle to idle. As the yaw decreased, the helicopter fell onto its left side (Figure 2).

Figure 2: VH-RBT at rest on the left side. Note the broken tail boom and rotor blades

Figure 2: VH-RBT at rest on the left side. Note the broken tail boom and rotor blades

Source: Pilot

Although hanging in the seatbelt, the pilot reached forward and shut off the mixture control and master switch. The pilot then egressed and assisted the passenger to undo their seatbelt and safely egress. Ground assistance arrived shortly after. The pilot reported that the fog was no longer on the windscreen.

The pilot was uninjured; however, the passenger sustained minor injuries. The helicopter was substantially damaged.

Pilot experience and comments

The pilot had a total of about 915 helicopter and fixed wing hours, with about 756 of these on Robinson 22 helicopters.

The pilot commented that:

  • the frost on the ground and the cold moist air above may have been mixed by the movement of the helicopter blades and caused the windscreen fogging
  • when the windscreen fogged, the pilot thought that the helicopter had been moving forward, however when the helicopter tail struck the ground, the pilot realised that the lack of visual reference had led to a loss of situational awareness. The helicopter had in fact been moving backwards
  • in hindsight, although the take-off was attempted immediately after first light, it may have been more prudent to delay the departure until the sun was properly up. This would have allowed a better natural horizon and a slight increase in temperature

Helicopter information

The helicopter had all the fittings and wiring to have a heater,[3] however the operator had removed the heater at the start of summer, and it had not been re-installed.

The pilot advised that there was a fresh air vent at the front of the windscreen, which ran up on the inside of the windscreen. It was their practice to keep this open, although the pilot could not be sure that is was open on the accident flight. The vents fitted to each door were initially closed.

Pilot operating handbook

The Robinson Helicopter Company Safety Notice SN-18 R Issued: January 85 and revised in February 1989 and June 1994 states:

LOSS OF VISIBILITY CAN BE FATAL

Flying a helicopter in obscured visibility due to fog, snow, low ceiling, or even a dark night can be fatal. Helicopters have less inherent stability and much faster roll and pitch rates that airplanes. Loss of the pilot’s outside visual references, even for a moment, can result in disorientation, wrong control inputs, and an uncontrolled crash. This type of situation is likely to occur when a pilot attempts to fly through a partially obscured area and realizes too late that he is losing visibility. He loses control of the helicopter when he attempts to turn to regain visibility but is unable to complete the turn without visual references.….

ATSB comment

A cold windshield that is exposed to slightly warmer or moist air can ‘fog up’. It is likely that the helicopter moved between different temperature layers as it moved forward and up, and this may have led to a combination of temperatures suitable to allow fog.

The use of heaters, demisters (if fitted) and air vents should always be operated as per the manufacturer’s recommendations.

Aviation Short Investigations Bulletin Issue 44

Purpose of safety investigations

The objective of a safety investigation is to enhance transport safety. This is done through:

  • identifying safety issues and facilitating safety action to address those issues
  • providing information about occurrences and their associated safety factors to facilitate learning within the transport industry.

It is not a function of the ATSB to apportion blame or provide a means for determining liability. At the same time, an investigation report must include factual material of sufficient weight to support the analysis and findings. At all times the ATSB endeavours to balance the use of material that could imply adverse comment with the need to properly explain what happened, and why, in a fair and unbiased manner. The ATSB does not investigate for the purpose of taking administrative, regulatory or criminal action.

Terminology

An explanation of terminology used in ATSB investigation reports is available here. This includes terms such as occurrence, contributing factor, other factor that increased risk, and safety issue.

Publishing information 

Released in accordance with section 25 of the Transport Safety Investigation Act 2003

Published by: Australian Transport Safety Bureau

© Commonwealth of Australia 2015

image_5.png

Ownership of intellectual property rights in this publication

Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this report publication is owned by the Commonwealth of Australia.

Creative Commons licence

With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence.

Creative Commons Attribution 3.0 Australia Licence is a standard form licence agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work.

The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you wish to use their material, you will need to contact them directly.

__________

  1. First light is when the centre of the sun is at an angle of 6° below the horizon before sunrise. At this time, the horizon is clearly defined but the brightest stars are still visible under clear atmospheric conditions.
  2. A primary helicopter flight control that simultaneously affects the pitch of all blades of a lifting rotor. Collective input is the main control for vertical velocity.
  3. The heater warms the air in the cabin and thus the windscreen

 

Occurrence summary

Investigation number AO-2015-064
Occurrence date 23/06/2015
Location 11 km east of Boyup Brook ALA,(Longridge Farm)
State Western Australia
Report release date 04/11/2015
Report status Final
Investigation level Short
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Aviation
Aviation occurrence category Weather - Other
Occurrence class Accident
Highest injury level Minor

Aircraft details

Manufacturer Robinson Helicopter Co
Model R22 BETA
Registration VH-RBT
Serial number 1980
Sector Helicopter
Operation type Private
Departure point Longridge Farm, WA
Destination Jandakot, WA
Damage Substantial

Separation issues between aircraft at Jandakot Airport, Western Australia

Discontinuation notice

Section 21 (2) of the Transport Safety Investigation Act 2003 (TSI Act) empowers the Australian Transport Safety Bureau (ATSB) to discontinue an investigation into a transport safety matter at any time. Section 21 (3) of the TSI Act requires the ATSB to publish a statement setting out the reasons for discontinuing an investigation.

Discontinuation notice of AI-2015-063

Between 2012 and 2017, the ATSB identified Jandakot Airport (Western Australia) as having a disproportionate number and rate per flight of airborne near collisions and other aircraft separation related issues compared with other class-D[1] metropolitan airports.[2] As a result, the ATSB commenced a safety study investigation under the Transport Safety Investigation Act 2003, which aimed to identify the factors that resulted in this apparent increased the collision risk to aircraft operating at Jandakot Airport.

Recent data analysis from July 2017–2019 indicates that this is no longer the case, and this safety study has therefore been discontinued.

The ATSB will continue to monitor issues associated with near collisions and separation issues at Class D metropolitan airports.

Background information

Trends at Jandakot Airport

The ATSB initially analysed aircraft separation related occurrences across a 10-year period from 2008 to 2017 in class-D and outside controlled airspace across Australia. Inside the class-D metropolitan airport control zones (3 NM around the aerodrome), all metropolitan airports had a similar rate of separation occurrences in the first years of the study (2008–2012). However, in the second half of the study period (2013–2017), Jandakot Airport had a statistically higher rate of occurrences per 100,000 flights, compared to both the previous five-years (2008–2012) and all other metropolitan airports. However, from July 2017, this higher rate of separation occurrences at Jandakot reduced substantially (Figure 1). Evaluation of occurrences beyond the initial 10-year study range (to the right of the orange line in Figure 1) revealed this lower rate was on par with other metropolitan airports, and has remained so for each six month period since (to June 2019).

Figure 1: Rate of separation occurrences per 100,000 movements within the 3 NM control zone, January 2008 to June 2019

Rate of separation occurrences per 100,000 movements trend beyond the study period (orange line), within the 3 NM control zone, January 2008 to June 2019

The reduction in the rate of separation related occurrences coincided with a 13 per cent reduction in the average number of flights in each 6-month period from July 2017 to June 2019 compared to flights from the previous five years. The number of separation related occurrences reduced by an average 65 per cent each 6 months from July 2017 to June 2019, five times more than the proportional reduction in flights, compared to the average of the previous five years.

Coinciding with the reduction in the number of flights at Jandakot Airport was the suspension of operations of a flight-training organisation from April 2017 at Jandakot Airport. In the five years prior, 25 of the 197 aircraft (about 13%) involved in separation related occurrences (98 occurrences) in the Jandakot class-D control zone were operated by that organisation; similar to the proportional reduction in the total number of flights described above. This suggests that if this particular flight training operator made up about 13 per cent of flights prior to suspending operations, it has been involved in the same proportion of separation related occurrences relative to the number of aircraft they had airborne. Therefore, during their active years, the organisation does not appear to have an over representation of aircraft directly involved in separation related occurrences at Jandakot.

That is, separation related occurrences reduced by five times more than the number of flights after the suspension of operations by a single flight training organisation, although occurrences directly involving that operator were probably were not disproportionately higher. Therefore, it is expected that other systemic factors existed contributing to the elevated rate at Jandakot between 2013 and 2017. It is possible that, in combination with the operational dynamics at the airport, increases in traffic density (the number of aircraft arriving, departing and in the circuit at the same time), at an already busy airport, had a disproportionate impact on the likelihood of a near collision. Additionally, dynamics in the control zone may have changed, through a different proportional mix of operations and aircraft types, such as ab-initio flight training, private and commercial flying. This in turn may have resulted in a reduction in the near collision risk.

The ATSB did not have information relating to the distribution of the types of operations conducted at Jandakot from 2008 to June 2019. However, the highest number of movements were between 2008 and 2012, and this period coincided with a considerably lower occurrence rate at Jandakot. Therefore, future increases in flight movements alone may not result in a disproportionate increase in separation related occurrences. However, it is possible that an increase in flight movements combined with a similar mix of organisations and operational dynamics to those occurring between 2013 and 2017 may result in the airborne collision risk increasing to previous levels at Jandakot Airport.

Other observations

Based on the reported data, the ATSB also made a number of observations during the analysis.

Pilot awareness of other aircraft

Overall, near collisions where neither pilot was aware of the other aircraft were more likely to involve a closer proximity distance than when at least one pilot was aware of the other aircraft. Consequently, in class-D airspace where air traffic control provide a verbal collision alert to either pilot, the distance between aircraft involved in near collisions were generally further than when no alert was provided.

Near collisions during air traffic control tower operations within the Jandakot Airport control zone were more likely to pass further away than near collisions at Moorabbin (Vic.) and Bankstown (NSW) airports. This was very likely due to a higher proportion of pilots at Jandakot Airport being aware of the other aircraft.

Collisions (class-D and outside controlled airspace)

There were 17 airborne collisions between 2008 and 2017. Almost all occurred at known geographical focal points for the activity conducted. Half involved approach, departure or within the circuit area of an aerodrome, with the other half involved both aircraft conducting the same type of activity (fire bombing, mustering, feral animal culling, gliding). Factors known to mitigate airborne collision risk in these circumstances are maintaining an effective lookout, using flight radio to identify other aircraft and alert other pilots, and implementing formalised strategies to coordinate between aircraft when conducting common operations.

Further steps

The ATSB did not identify any ongoing safety issues with this analysis. However, the ATSB will brief both the Civil Aviation Safety Authority and Airservices Australia on the detailed analysis to help with future airspace planning.

 

__________

  1. Class-D airspace is controlled airspace surrounding general aviation and regional airports equipped with a control tower. All flights require air traffic control clearance to operate in this airspace. Positive separation between aircraft is only provided between IFR and special VFR flights. Traffic information (not separation) is provided to and about VFR flights.
  2. Class-D metropolitan airports refers to towered airports operating procedurally controlled (class-D) airspace in Australia’s capital cities, specifically, Archerfield Airport (Brisbane), Bankstown Airport (Sydney), Jandakot Airport (Perth), Moorabbin Airport (Melbourne) and Parafield Airport (Adelaide).

Occurrence summary

Investigation number AI-2015-063
Occurrence date 22/06/2015
Location Jandakot
State Western Australia
Report release date 26/11/2019
Report status Discontinued
Investigation type Safety Issue Investigation
Investigation status Discontinued
Mode of transport Aviation
Aviation occurrence category Separation issue
Occurrence class Other

Derailment of TasRail train 135, Kimberley, Tasmania, on 25 January 2015

Final report

Safety summary

What happened

A limited-scope, fact-gathering investigation into this occurrence was conducted in order to produce this short summary report and allow for greater industry awareness of potential safety issues and possible safety actions.

On 25 January 2015, TasRail train 135 was travelling the Western Line between Railton and Deloraine (Tasmania). The train consisted of two locomotives TR01 & TR14 hauling 28 wagons. The trailing load was about 1254 tonnes and total train length (including locomotives) was about 460 m.

At about 2151, train 135 derailed near Kimberly (about 30 km south of Devonport) as it traversed an occupation crossing[1] at the(kilometre point) KP W99. As a result, 10 wagons derailed and 220 m of track was damaged. There were no injuries.

Train 135 and derailed wagons

Train 135 and derailed wagons

Source: TasRail

What was found

Track geometry

The track between the KP W92 and KP W100 had been subject to various speed restrictions since 2008. In June 2014, a temporary speed restriction (TSR) was put in place due to poor track condition - reducing track speed from 30 km/h to 20 km/h. An increased track inspection frequency had been implemented with track patrols monitoring defect deterioration at 96 hour intervals.

Post-derailment track measurement identified a number of track geometry defects in the vicinity of the occupation crossing. The defects consisted of a sequence of (vertical) track twists and horizontal misalignments.

The track defects exceeded the limits specified in the TasRail Track and Structure Maintenance Standard (INF-TS-211 dated 1 March 2014), and were being managed through the application of a temporary speed restriction in accordance with an Infrastructure Waiver (018, dated 5 November 2014).

Rolling stock

The first wagon to derail was a QL class wagon. The QL class was a flat container wagon (originally a standard gauge RENY class wagon) converted for use on the TasRail narrow gauge rail network. The wagons were about 15.2 m in length with a deck height of about 1110 mm.

Wagon QLE23/P (the first wagon to derail) was loaded with two, twenty-foot equivalent (TEU) standard shipping containers. Each container was loaded with general goods, with a gross mass of 18.5 t and 22.4 t respectively. The load within each container was stacked uniformly to almost roof height. While the load generally conformed to the requirements of the TasRail Freight Loading Manual, calculations indicated that the load most likely exceeded the maximum centre of gravity limit of 1700 mm (above rail). All other components and parameters of wagon QLE23/P were within maintenance limits.

Conclusion

It was concluded that the sequence of track defects (twist and alignment) initiated harmonic body roll of the QL class wagon. When combined with the high centre of gravity of loaded wagon QLE23/P, the harmonic behaviour likely resulted in wheel unloading, promoting flange climb and the subsequent derailment of train 135.

Safety action

As a result of this occurrence, the TasRail has advised the ATSB that they are taking the following action in order to reduce their safety risk:

  • Suspension of QL wagons from intermodal traffic pending outcome of investigation.
  • Maintain a register of known track faults.
  • Measure major track faults every 96 hour inspection of the infrastructure, for track deterioration.
  • Review current condition monitoring methods and frequencies, and implement changes to detect and manage similar defects to those observed at the derailment location.
  • Re-write / update Section B of the Freight Loading Manual regarding container loading restrictions and what wagons are applicable.
  • Reduce the TSR speed where legacy wagons are in use and rail faults dictate.
  • Check / update the Tasrail Operational Risk Register.

ATSB comment

The ATSB has, in the past, investigated derailments with similar contributing factors. On 22 May 2007, ballast train 3MR2 derailed near Roopena, SA (ATSB investigation RO-2007-003). In that instance, the investigation determined that a combination of track geometry and rolling stock factors combined to cause the derailment. The investigation also found that uneven load distribution had contributed.

While a number of actions have been taken to address the safety issues, the ATSB concluded that there were further opportunities for improvement, such as:

  • Consideration of the combined effects of track geometry defects when assessing a track speed suitable for safe rail operations.
  • Consideration of the characteristics of poorer-riding rolling stock when assessing track geometry defects for the application of temporary speed restrictions.

Safety message

In light of previous similar occurrences, this incident further highlights to operators and maintainers, the importance of considering the combined effects of adjacent or localised track geometry irregularities when assessing appropriate temporary speed restrictions. The incidents also highlight the importance of considering freight loading (centre of gravity and load distribution) and the dynamics of poorer-riding rolling stock, when assessing track geometry defects and determining a suitable speed limit for train operations.

Purpose of safety investigations

The objective of a safety investigation is to enhance transport safety. This is done through:

  • identifying safety issues and facilitating safety action to address those issues
  • providing information about occurrences and their associated safety factors to facilitate learning within the transport industry.

It is not a function of the ATSB to apportion blame or provide a means for determining liability. At the same time, an investigation report must include factual material of sufficient weight to support the analysis and findings. At all times the ATSB endeavours to balance the use of material that could imply adverse comment with the need to properly explain what happened, and why, in a fair and unbiased manner. The ATSB does not investigate for the purpose of taking administrative, regulatory or criminal action.

Terminology

An explanation of terminology used in ATSB investigation reports is available here. This includes terms such as occurrence, contributing factor, other factor that increased risk, and safety issue.

Publishing information

Released in accordance with section 25 of the Transport Safety Investigation Act 2003

Published by: Australian Transport Safety Bureau

© Commonwealth of Australia 2015

image_5.png

Ownership of intellectual property rights in this publication

Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this report publication is owned by the Commonwealth of Australia.

Creative Commons licence

With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence.

Creative Commons Attribution 3.0 Australia Licence is a standard form licence agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work.

The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you wish to use their material, you will need to contact them directly.

[1]   Level crossing provided for a private roadway.

Occurrence summary

Investigation number RO-2015-001
Occurrence date 25/01/2015
Location Near Kimberley
State Tasmania
Report release date 18/06/2015
Report status Final
Investigation level Short
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Rail
Rail occurrence category Derailment
Occurrence class Incident
Highest injury level None

Train details

Train number Train 135
Train damage Substantial