The Occurrence

What happened

At 1455 (Western Standard Time) on 16 February 2015, Happy Buccaneer (cover) berthed at the Roy Hill Wharf, Port Hedland, which was under construction. On board were 47 modules for the wharf, with individual weights of up to 931 t. The larger modules could take up to 24 hours to lift off the ship and place into position on the wharf pilings.

At 1235 on 22 February, the fifth module had been placed in position. Later that afternoon, the ship was moved along the wharf, in preparation for a lift the next day and, at 1800, work for the day was stopped.

At 0600 on 23 February, the crew was tasked by the chief mate with clearing an area for stacking hatch covers in order to gain access to the next module. The work involved moving packs of load spreaders[1] from on top of the hatch covers to the ’tween deck.[2]  

Figure 1: Positions of the crew
MO-2015-011_fig1
Source: Australian Transport Safety Bureau (ATSB)

At 0630, after a tool box talk,[3] the crew started the work. Working with the second mate on deck were two able-bodied seamen (AB) tasked with hooking up the packs of load spreaders. The boatswain (bosun), the ship’s technician and two Abs were on the ’tween deck (Figure 1), to position the packs and remove the sling hooks. All crew involved in the moving of the load spreaders had performed this task before and were familiar with the operation.

The second mate was operating the crane’s[4] 25 t auxiliary hook using a wireless remote control unit. The remote allowed him to move around the area to maintain a good line of sight while lifting from the deck, and to move to the edge of the hatch opening when lowering the packs.

By about 0900, two packs of load spreaders had been moved and the third pack had been lowered to the ’tween deck. The two ABs removed their hooks and left the chain slings hanging against the side of the pack. They then moved clear, towards the centre of the hold.

The technician was having difficulty removing the sling hook on his corner so the bosun went to assist him. Once the sling hook had been freed, they began walking forward between the load spreaders and the side of the hold. As they walked, the bosun signalled to the second mate to raise the hook.

When the technician and the bosun were about half way along the side of load spreaders, the two ABs saw the topmost load spreader lift up and start to slide off the top of the pack. They shouted warnings to the second mate and the two men, however, there was not enough time for either of the men to move clear and they were both struck by the load spreader as it slid towards them.

On the bridge, the chief mate heard the loud noise of the load spreader falling. As he made his way to the ’tween deck he called the second mate on the radio and asked what had happened. When he got closer, he heard the cries of the injured men. He called the master, advised that there had been an accident and that medical assistance was required. The master asked the ship’s agent, who was on board at the time, to arrange for medical assistance from ashore.

When the chief mate arrived at the accident site, he saw the bosun and the technician lying in awkward positions on top of the load spreader (Figure 2). The technician’s right leg was pinned under the load spreader and he had fractured both legs. The bosun was not trapped but had suffered fractures to his lower left leg. The chief mate updated the master as to the severity of the situation and began arranging first aid.

Figure 2: Fallen load spreader
Figure 2: Fallen load spreader
Source: AMSA

At about 0910, the first paramedics from McConnell Dowell, the company constructing the wharf, arrived. Shortly afterwards, other emergency service personnel from McConnell Dowell, the Fire and Emergency Service and St John Ambulance arrived.

The injured men were freed by the ship’s crew with the assistance of shore personnel. Both were then stabilised and prepared for evacuation. At about 1005, the bosun was lifted ashore and taken to Port Hedland hospital. About 50 minutes later, the technician was lifted ashore and taken to the hospital.

Treatment for the leg fractures of both men required extensive orthopaedic surgery. The technician’s right leg had to be amputated below the knee and he also had a fractured pelvis.

On 24 February, both men were transferred to a hospital in Perth. They continued to receive medical treatment there until they were well enough to travel home.

ATSB comment

The crew’s usual practice was to lift the load spreaders as a pack of four by attaching the sling hooks to the bottom spreader. Timber was placed between each load spreader and the pack was not lashed or secured by any means as a single unit.

After releasing the chain hooks from the spreaders, the slings were left against the side of the pack. When raised, the chain hooks were dragged up the pack’s side. In this instance, the hammerlock link (Figure 3), used to attach the sling’s hook to the chain, probably caught on the lip of the topmost load spreader and lifted it to the point where it was able to slide sideways off the pack.

Figure 3: Hammerlock joining link
Figure 3: Hammerlock joining link
Source: AMSA

The crane’s auxiliary hook winch was fitted with a soft start/stop feature to avoid shock loads. Therefore, when the remote control’s lever was moved to the neutral position to stop the hook, it would take a few moments for the hook to slow and then stop. This feature meant the hook continued to lift the load spreader after the lever was placed in the stop position.

When the load spreader started sliding sideways, the bosun and technician were not clear of the pack. Further, their position between the pack and the side of the cargo hold restricted their ability to move away from the falling spreader.

Safety action

Whether or not the ATSB identifies safety issues in the course of an investigation, relevant organisations may proactively initiate safety action in order to reduce their safety risk. The ATSB has been advised of the following proactive safety action in response to this occurrence.

Spliethoff's Bevrachtingskantoor

Spliethoff's Bevrachtingskantoor, Happy Buccaneer’s managers, advised that they have taken the following action to avoid a similar accident:

Additional (simulator) training and instruction will be given to crane operators with emphasis on:

  • Hook speed during simultaneous crane movements, and that the crane shall not be moved until there has been clear communications by hand, radio or other method.
  • Crane operators, banksmen (dogmen) and assisting crew should be aware of each other’s location and movement of suspended loads.
  • Rigging gear shall be guided until it is free of obstacles and equipment should be made safe for lifting prior to the lift.
  • Lifts, formed of multiple loose items, will be combined and secured to form a single unit prior to lifting.

Safety message

Other than unintended falling / dropping, there are numerous other hazards associated with suspended load operations. Some of those hazards continue posing a serious injury risk even after the load is landed. Risks can be particularly high when the load comprises a number of unsecured components that can move as individual units. Lifting and handling procedures and practices should anticipate the hazards (through risk assessment) and be planned to minimise the associated risks.

The ATSB SafetyWatch program highlights the broad safety concerns that come from investigation findings and from the occurrence data reported by industry. Marine work practices are one of those safety concerns.


 

[1] For placing under very heavy loads, the steel load spreaders measured 4.0 x 1.2 x 0.3 m and weighed 2.4 t.

[2]  A ’tween deck is a fixed or moveable deck between the hold floor and the hatch cover.

[3]  A safety focussed discussion, undertaken by a work team before starting work, to cover key elements of the task and the risks involved.

[4]  A Huisman-Itrec, 700 t heavy lift, mast crane, which does not have an operator’s cabin.

Download final report
[ Download PDF: 1.34MB]
 
 
 
 
 
 

To download an image click the download link then right-click the image and select save image as.

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you want to use their material you will need to contact them directly.

 
General details
Date: 23 February 2015 Investigation status: Completed 
Time: 0900 WST Investigation type: Occurrence Investigation 
Location   (show map):Port Hedland  
State: Western Australia  
Release date: 23 June 2015 Occurrence category: Accident 
Report status: Final Highest injury level: Serious 
 
Vessel details
Vessel: Happy Buccaneer 
Flag: Netherlands 
IMO: 8300389 
Sector: Other 
Type of Operation: Heavy Lift 
Damage to Vessel: Nil 
Destination:Roy Hill Wharf, Port Hedland
 
 
 