Rail safety investigations & reports

Collision between train 1901S and train 5132S at Dry Creek, South Australia on 11 October 2011

Investigation number:
RO-2011-016
Status: Completed
Investigation completed

Summary

Download Final Report
[Download  PDF: 6.12MB]
Alternate: [Download  DOC: 3.76MB]
 

What happened

At approximately 0105 on 11 October 2011, empty ore train 1901S, operated by Specialised Bulk Rail Pty Ltd, passed signal 13 displaying a stop indication at Dry Creek Junction in South Australia.

Train 1901S subsequently collided with loaded grain train 5132S, operated by Genesee and Wyoming Australia Pty Ltd, that was travelling in the opposite direction and traversing the turnout at Dry Creek Junction to enter the Dry Creek North Yard.

The collision was at low speed and there was no injury to the train crew of either train. There was significant damage to the crew cab of the lead locomotive of train 1901S and to the grain wagons of train 5132S that were struck during the collision.

What the ATSB found

The ATSB determined that the collision between train 1901S and 5132S was a result of train 1901S passing signal 13 at stop (SPAD). The SPAD of signal 13 was a result of the driver-in-training and co-driver (supervising driver) of train 1901S becoming distracted during the approach to the preceding signal, 135, which was displaying a caution aspect indicating that signal 13 ahead was at stop.

The investigation revealed that a combination of individual actions and systemic issues contributed to the collision. The driver’s lack of route knowledge, combined with an expectation of a clear run through the area probably influenced his failure to observe signal 135 at caution. The supervising driver was completing an administrative task that diverted his attention away from the primary task of supervising the actions of the driver-in-training.

The absence of adequate procedures to provide supervising drivers with sufficient direction as to the nature of their supervisory role and to inform of the level of competency attained by a driver-in-training resulted in the breakdown of operational risk controls.

The ATSB investigation explored fatigue impairment as a causal factor related to the SPAD of signal 13. While fatigue impairment was not considered a contributing safety factor in this occurrence, the importance of a rigorous fatigue risk management program subject to continual improvement is highlighted.

What has been done as a result

Following the collision at Dry Creek Junction, Specialised Bulk Rail Pty Ltd amended procedures that clarify the role and responsibilities of a driver supervising a trainee, and introduced arrangements to inform the supervising driver of the trainee’s level of competency.

Safety message

Rail operators must implement robust procedures that systematically manage the supervision, training, and assessment of drivers’ route knowledge to ensure competency and address any risks inherent in the operational task.

Download Final Report
[Download  PDF: 6.12MB]
 
 
Alternate: [Download  DOC: 3.76MB]
 

Preliminary

Download Preliminary Report
[Download  PDF: 333KB]
Alternate: [Download  DOC: 787KB]
 

Preliminary report published 19 December 2011

At about 0105 on 11 October 2011 an empty (northbound) ore train (1901S) travelling on the interstate main line from Pelican Point (Outer Harbor, South Australia) to Rankin Dam (Coober Pedy) passed signal 13 at Dry Creek Junction displaying a stop (red) indication. Train 1901S subsequently collided at low speed approximately mid-consist with a loaded (southbound) grain train (5132S) that was traversing a turnout at Dry Creek Junction to enter the Dry Creek North Yard in South Australia.

There was no injury to the train crews as a result of the collision. There was significant damage to the crew cab of the lead locomotive of train 1901S and to the grain wagons of train 5132S that were struck during the collision.

Download Preliminary Report
[Download  PDF: 333KB]
 
 
Alternate: [Download  DOC: 787KB]
 

Photo

To download, click the link, then right-click and select Save As.

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations and should be credited accordingly.

General details
Date: 11 October 2011   Investigation status: Completed  
Time: 0105 CDT    
Location   (show map): Dry Creek   Investigation level: Complex  
State: South Australia    
Release date: 03 April 2013    
Report status: Final   Occurrence category: Accident  
  Highest injury level: None  

Train 1 details

Train 1 details
Train registration 1901S  
Type of operation Bulk ore train  
Damage to train Serious  

Train 2 details

Train 2 details
Train registration 5132S  
Type of operation Bulk grain train  
Damage to train Serious  
Last update 14 November 2018