| Safety issue description |
The general condition of the rail on the west track, in the vicinity of the rail fracture, contributed to relatively frequent failures in that area. |
|---|---|
| Issue number | RO-2015-023-SI-01 |
| Issue owner | BHP Billiton |
| Transport function | Rail: Freight |
| Date issue released | 12/10/2018 |
| Issue status justification |
The re-railing program that included the track in the vicinity of the derailment, together with measures taken and proposed to improve track condition and integrity, adequately addresses this safety issue. |
| Action type | Proactive action |
|---|---|
| Action number | RO-2015-023-NSA-046 |
| Organisation | BHP Billiton |
| Action date | 12/10/2018 |
| Action description |
In response to this occurrence, BHP Billiton (BHPB) conducted an internal investigation that resulted in the following safety action: 1: Re-railing
Aluminothermic rail welding is being phased out in favour of mobile flash butt welding, in order to reduce the development of rail defects. 2: Prevention of rolling contact fatigue (RCF) cracks developing into transverse defects
3: Rail flaw detection
BHPB also advised that they were taking action to reduce the occurrence of high wheel impact loading through the introduction of an improved wheel profile and the elimination of track geometry known to result in high impact loads. Finally, regular and independent audits/reviews of key rail integrity aspects have been established to reduce the risk of derailment. |
| Action status | Closed |