| Safety issue description |
A caution order instrument was used that lacked a specific requirement for train crews to check the points along their route. This requirement becomes critical under circumstances of signalling system degradation. |
|---|---|
| Issue number | RO-2013-027-SI-02 |
| Issue owner | Australian Rail Track Corporation |
| Transport function | Rail: Infrastructure |
| Date issue released | 13/01/2015 |
| Action type | Proactive action |
|---|---|
| Organisation | Australian Rail Track Corporation |
| Action date | 13/01/2015 |
| Action description |
ARTC has made changes to the Signalman’s Caution Order (Form number 2377). The changes include a requirement for the NCO, when issuing a Signalman’s Caution Order, to ensure the following actions are undertaken:
|
| ATSB response |
The ATSB is satisfied with the action taken by ARTC to address the safety issue. |
| Action status | Closed |