Safety issue

Safety issue description

The placement of the insulated rail joints adjacent to signal DYN150 was not in accordance with the ARTC engineering procedure ESC-07-01.

Issue number RO-2013-020-SI-01
Issue owner Australian Rail Track Corporation
Transport function Rail: Infrastructure
Date issue released 16/10/2015
Issue status justification

The ATSB is satisfied that the action taken by the ARTC addresses this safety issue.

Safety action

Action type Proactive action
Action number RO-2013-020-NSA-097
Organisation Australian Rail Track Corporation
Action date 16/10/2015
Action description

Within Victoria, the Australian Rail Track Corporation initiated a survey to measure and record the position of insulated joints relative to the position of the signal to which they refer. Sites where the maximum specified distance was exceeded were entered into a risk-based and prioritised remediation plan.

Action status Closed