| Safety issue description |
The train control system screen display provided no direct indication to the network control officer that one section of the established route was dual-gauge and another section single-gauge. |
|---|---|
| Issue number | RO-2013-009-SI-01 |
| Issue owner | Australian Rail Track Corporation |
| Transport function | Network Operations |
| Date issue released | 04/09/2014 |
| Issue status justification |
A clearly visible and audible on-screen alert for the network controller can be expected to contribute towards preventing a recurrence of this incident. |
| Action type | Proactive action |
|---|---|
| Action number | RO-2013-009-NSA-059 |
| Organisation | Australian Rail Track Corporation |
| Action date | 04/09/2014 |
| Action description |
The network control officer currently receives a warning dialogue box if the train gauge and route selected are incompatible. The signal interlocking will hold the signal at stop if the route selected and train gauge are incompatible. |
| ATSB response |
|
| Action status | Closed |
| Date received | 06/05/2013 |
|---|---|
| Organisation | Australian Rail Track Corporation |
| Response status | Closed |
| Response text |
On-screen gauge alert The train control system software has been modified to provide for an acknowledgable on-screen alert in the event that a network controller attempts to set a route that includes the wrong gauge for the train that is to use it. |
| ATSB response |
The ATSB is satisfied that this proposed action will adequately address the safety issue. |
| Action type | Proactive action |
|---|---|
| Action number | RO-2013-009-NSA-060 |
| Organisation | Australian Rail Track Corporation |
| Action date | 19/08/2014 |
| Action description |
ARTC will investigate with the Train Control System provider (Ansaldo) the option of removing the ‘route set’ functionality from the screen display where there is incompatibility between the route selected and the train gauge required. |
| ATSB response |
The Australian Transport Safety Bureau is satisfied that the action taken by ARTC adequately addresses the safety issue. |
| Action status | Closed |