Safety issue

Safety issue description

Regular monitoring and accurate measurement of rail creep was not carried out at the east end of the curve where train 6MB2 derailed in accordance with Civil Engineering Circular 3/87 - 70.2 and 70.3. Creep monuments were not installed on the east end of the curve following the work to convert the passing loop track to mainline operation in July 2008.

Issue number RO-2009-004-SI-02
Issue owner Australian Rail Track Corporation
Transport function Rail: Infrastructure
Issue status No longer relevant
Date issue released 22/12/2010
Issue status justification

The ARTC have not provided a response to this minor safety issue prior to publication of the final report. ARTC have advised that a response will be provided in due course.

Safety action

Action type Safety advisory notice
Action number RO-2009-004-SAN-032
Organisation ARTC
Action date 22/12/2010
Action description

The Australian Transport Safety Bureau advises that the ARTC should consider the implications of this safety issue and take action where considered appropriate.

Action status Closed