Ultrasonic testing
Issue number
Issue Owner
Australian Rail Track Corporation (ARTC)
Mode of Transport
Rail
Safety Issue Description
A single extra pulse echo was recorded during the last ultrasonic inspection of the rail, nine months before the derailment, in the vicinity of the failure. An examination with handheld ultrasonic testing equipment at the time concluded there was no sizable defect in the rail, even though the evidence suggests that the fatigue cracks existed (to some degree) at the time.
Safety recommendation
Action number
RO-2008-004-SR-011
Organisation
Australian Rail Track Corporation (ARTC)
Action Status
Closed
Action description

A single extra pulse echo was recorded during the last ultrasonic inspection of the rail, nine months before the derailment, in the vicinity of the failure. An examination with handheld ultrasonic testing equipment at the time concluded there was no sizable defect in the rail, even though the evidence suggests that the fatigue cracks existed (to some degree) at the time. The ATSB recommends that the ARTC should address this safety issue.