DEENA 7 Standard instrument departure had no positive separation assurance method
SFIS surveillance coverage
Removal of repeat back requirement
Training for introduction of eTAP
Undetected cracking resulted in failure
Onboard inspection and maintenance
Requirements of NTR 432 and NPR 750 not applied
Signaller refresher training
Assurance and audit process
Loading of high cube containers into bay 62
Deck fittings in poor condition
Regulatory guidance for stabilised approach criteria