Final report
Report release date: 30/06/2005
Executive summary
Train 6WP2 operated by Pacific National Ltd (PN) derailed at 2222 (central summer time) on Sunday 9 November 2003 as it was passing through Bates, South Australia. The train had departed Port Augusta that morning and was proceeding to Perth, Western Australia.
The derailment was limited to wagon number RKCX24 positioned 21st in a train of 73 wagons. The condition of a Roller Bearing Unit (RBU) on the right hand third axle of the wagon had progressively deteriorated to a point where friction induced heat caused the portion of axle between the RBU and the wheel to become ‘plastic1’ causing the RBU to seize where upon the axle separated or ‘screwed’ off as the axle turned.
After approximately 200 metres in this state, the leading end bogie side frame dropped to the outside of the right hand rail. The wheels did not leave the rails until reaching the western end of Bates, where the crossing loop points caused a destabilising effect. The train was brought to a stop in just over 1000 metres by the train crew from a speed at the time of derailment of 77 km/h.
Approximately 1,275 metres of track sleepers and 150 metres of rail were damaged as a result of the derailment. No injuries were reported and no dangerous goods were involved.
It was concluded that train 6WP2 derailed due to the failure of a RBU on wagon RKCX24.A number of causal factors relating to bearing roller assembly cage failure were identified in the investigation associated with: bearing refurbishment and assembly; storage; and handling of the wheel set.
Contributing factors:
- From the investigation evidence it was found that the most likely cause of the RBU failure was roller assembly cage failure leading to inner ring loss of interference fit on the axle journal.
- The workshop assembling and fitting of the RBU to the axle journal was a possible contributing factor to cage failure based on the short service life of the unit.
- There was some evidence of lateral movement, due to excessive end-play, within the intact RBU at the opposite end of the axle to the failed RBU. Such movement could probably have contributed to the failure of the RBU.
- Probable water ingress from less than optimum storage of the RBU was suggested by evidence, as detected by Bearing Acoustic Monitoring systems (RailBAM).
- The radius of the RBU at the opposite end of the axle to the failed RBU was out of specification and displayed signs of rust.
- Validated procedures for RailBAM to provide guidelines for its use had not been put in place by PN or the Australian Rail Track Corporation (ARTC).
- The interim criteria adopted by PN for removing high risk wagons, based on the RailBAM and Wheel Condition Monitoring (WCM) data, did not identify wagon RKCX24 as having a reading sufficiently serious to remove it from service.
The report recommends that:
- PN undertake a review and implementation of remedial action as required of workshop processes for the care and fitment of bearings to make sure that appropriate measures are in place to reduce the risk of subsequent cage related failure.
- PN undertake a review and implementation of remedial action as required of the storage, transportation, and handling of bearings to make sure that appropriate measures are in place to reduce the risk of accidental damage, particularly with regard to stored RBUs fitted to wheel sets.
- PN undertake a review and implement remedial action as required of the refurbishment and assembly of bearings.
- PN further develop and validate their procedure for the use of WCM systems.
- PN continue their utilisation of RailBAM with a view to improving the application of the information provided as soon as practicable and in line with their Major Hazard Action Plan.
- PN and the ARTC develop and validate a procedure for the use of RailBAM.
- The South Australian Railway Safety Regulator monitor the implementation of validated procedures in PN for WCM.
- The South Australian Railway Safety Regulator monitor the continued development towards feasible implementation of RailBAM and ensure that validated procedures for its use are implemented in both PN and the ARTC.
______________________________
- The ability of a metal to be deformed extensively without rupture.
Occurrence summary
| Investigation number | 2003004 |
|---|---|
| Occurrence date | 09/11/2003 |
| Location | Bates |
| State | South Australia |
| Report release date | 30/06/2005 |
| Report status | Final |
| Investigation type | Occurrence Investigation |
| Investigation status | Completed |
| Mode of transport | Rail |
| Rail occurrence category | Derailment |
| Occurrence class | Accident |
| Highest injury level | None |
Train details
| Train number | 6WP2 |
|---|---|
| Type of operation | Freight Train |
| Departure point | Port Augusta |
| Destination | Perth |
| Train damage | Minor |