Executive summary

On 1 July 2001 at approximately 0538 hours, EG37, a Locotrol II-equipped1 coal train operated by QR, was hauling 120 fully loaded wagons from Coppabella to Hay Point, Mackay, and commenced to negotiate the steep descent of the Connors Range.

Shortly after, the Driver reported to the Train Control Centre in Mackay that he had a ‘runaway’ train and that he had been in Emergency Brake for some minutes.

As EG37 reached a speed of 93 km/h, it entered a left curve in the track approximately 38 km from Hay Point. The front portion of the train, including the first 28 wagons, separated from the remainder of the train but stayed on the track. Seventy-four of the following wagons, the two remote locomotives and the Electric Locomotive Control Unit2 (ELRC) derailed at that time. The last 18 wagons on the rear of the train remained on the track.

Within seconds of separating from the rest of the train, the front portion of the EG37 commenced to rapidly decelerate. It stopped some two minutes later and approxi mately two kilometres beyond the point of separation.

Neither of the Drivers was injured as a result of the accident.

It was later determined that the sequence of events had been triggered by an extended loss of the Locotrol radio signal3 at the top of the range and that the back-up safety mechanism in the Train Brake system of EG37’s ELRC had failed due to a supernu merary errant O-ring lodged in the seat of the cut off portion of the Brake Pipe Control Valve. As a result of that failure, the Remote Feed Valve at the ELRC remained open and fed air into the Train Brake Pipe throughout the accident sequence, opposing Train Brake applications made by the Driver. Consequently, the braking capacity of EG37 was reduced to something less than half its normal braking capacity and was insufficient to allow the Driver to control the speed of the train as it travelled down the range.

Despite extensive testing, the investigation has not been able to determine the reason for the extended loss of Locotrol radio signal.

It could not be precisely determined when the errant square-section O-ring was introduced into the Brake Pipe Control Valve. However, if relevant overhaul, bench test and functional checks had been followed in accordance with the then current procedures, the fault should have either been clearly identified or clues may have been provided as to its existence.

Immediately following the accident, in the absence of any clearly identified fault at that time, QR introduced modified procedures for handling trains down the Connors Range.

Following the identification of the fault in the Train Brake system, modified functional test procedures were introduced within the maintenance program, which specifically checks the cut off function of the Remote Feed Valve and has increased the frequency of that check by requiring it to be carried out at Terminal Examinations.

As a result of this investigation, a number of outstanding safety actions have been identified. It is recommended that QR progress those safety actions as part of the process of continuous improvement within its Safety Management System. Those safety actions relate to:

  • Underlying reason/s for the extended loss of Locotrol radio communications;
  • Threshold limits for both frequency and length of Locotrol radio communication interruptions;
  • Real-time information about the status of Train Brake continuity;
  • Mechanisms or options to ensure adequate Train Braking efficiency in abnormal and emergency situations;
  • Train maintenance practices and procedures;
  • Adherence to prescribed train operating procedures;
  • Arrangements in relation to Authorised Persons;
  • Fitment of Dataloggers; and
  • Collection and recording of evidence for safety investigations.

Refer to the Analysis and Safety Action sections of this report for further detail on the issues and safety actions described above.

___________________________

  1. Refer to the Locotrol System Design section of this report for further details on the Locotrol system
  2. Refer to the Locotrol System Design section of this report for further details on the ELRC
  3. The radio signal used to control locomotives in the centre of a train

Occurrence summary

Investigation number 2001/003
Occurrence date 01/07/2001
Location Black Mountain
State Queensland
Report release date 01/10/2001
Report status Final
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Rail
Occurrence class Accident
Highest injury level None