Derailment of train 9614S, near Port Augusta, South Australia, on 17 February 2013

RO-2013-007

Final report

Safety summary

What happened

On 17 February 2013, ore train 9614S was departing Spencer Junction en route to Whyalla, South Australia. While the train was traversing 38A points at the northern end of Spencer Junction, the driver noticed a change in the train’s dynamic behaviour and immediately reduced the throttle. The train then quickly came to a stop due to the automatic application of the electronically controlled pneumatic train brake. Upon inspection of the train, the second driver discovered five ore wagons were derailed.

What the ATSB found

The ATSB’s investigation found that the leading edge of the right hand 38A point blade was worn and damaged. The blade damage had created a ramping angle, allowing the lead wheel of the ore wagon to “ride up” the blade and derail. The derailed wheels then impacted and damaged the concrete sleepers, which ultimately failed to maintain track gauge and allowed further wagons to derail. During the derailment sequence, a rupture to the train’s electronic control pneumatic pipe initiated the application of the train brake.

The ATSB found that the Australian Rail Track Corporation’s inspection and maintenance regime, following two similar derailments at the same location, had not been sufficient to identify and remediate the deteriorating condition of the 38A points, and ultimately contributed to the derailment.

What's been done as a result

In the months leading up to this derailment, Genesee Wyoming Australia (GWA) and the Australian Rail Track Corporation (ARTC) had agreed to a rail upgrade programme which included a new turnout incorporating 38A points, using 60 kg rail laid on concrete bearers. At the time of this derailment, a new turnout had been prepared, but had not yet been installed. Upgrade works have since been completed.

Following installation of the upgraded infrastructure, more frequent monitoring for wear rates of the point blade(s) was undertaken. After several months of condition monitoring it became evident that track performance and wear rates could be managed as specified in the Code of Practice and the normal inspection schedule was reinstated.

Safety message

Track infrastructure owners and maintainers should consider the associated increase in wear on track infrastructure when there is an increase in the volume of rail vehicles being operated. The high dynamic forces that may be exerted from rail vehicles, specifically those that bear a heavy axle load, will accelerate the rate of wear on track infrastructure.

In these circumstances, increased inspection and maintenance of track components should be considered until it can be established that resulting wear rates can be adequately managed in accordance with the established standards.

Occurrence summary

Investigation number RO-2013-007
Occurrence date 17/02/2013
Location Port Augusta
State South Australia
Report release date 14/01/2015
Report status Final
Investigation level Systemic
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Rail
Rail occurrence category Derailment
Occurrence class Accident
Highest injury level None

Train details

Train number 9614S
Type of operation Freight
Departure point Wirrida, SA
Destination Whyalla, SA
Train damage Substantial