Safeworking breach – track machine BC7, Bogan Gate, New South Wales, on 15 August 2011

RO-2011-013

Final report

What happened

During track work, the Traffic Officer instructed the Track Machine Operator to travel beyond the limit of the Track Occupancy Authority that had been granted.

Safety message

This occurrence highlights potential for confusion around terminology used in Track Occupancy Authority notices. All track personnel and operators are reminded of the need to ensure they know the limits of their authority before moving vehicles.

Occurrence summary

Investigation number RO-2011-013
Occurrence date 15/08/2011
Location Bogan Gate
State New South Wales
Report release date 26/09/2012
Report status Final
Investigation level Short
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Rail
Occurrence class Incident
Highest injury level None

Train details

Departure point Parkes, NSW
Destination Bogan Gate, NSW
Train damage Nil