Level Crossing Collision, Birkenhead, South Australia, on 5 March 2008

RO-2008-001

Final report

Report release date: 06/10/2009

Executive summary

At about 1448 on Wednesday 5 March 2008, a double trailer road-train loaded with bulk cement drove into the path of train 4A13N at the Stirling Street level crossing, Birkenhead, SA. The road train driver was slightly injured while the two train drivers were shaken but otherwise unhurt.

Train 4A13N was conveying four empty fuel tankers for loading at the Mobil fuel depot that is about 1 km beyond the Stirling Street level crossing. The road-train had just departed from the Adelaide Brighton Cement Works at Birkenhead with a consignment of cement that was bound for Roxby Downs in central SA.

The Stirling Street level crossing is located on the dual gauge Dry Creek to Outer Harbor ‘freight only’ rail corridor. Stirling Street is a short, sealed, two-way dead end street that provides access to bulk fuel and cement facilities in the immediate vicinity.

For about 34 months before the collision, the Port River Expressway Project had been underway on the Dry Creek to Outer Harbor rail corridor. The project included the re-laying of the rail line and the upgrade of the Stirling Street level crossing from passive control (‘Stop’ sign) to active control (flashing lights and boom barriers). These works were only partially completed at the time of the collision.

On the day of the collision, the Stirling Street level crossing was within a worksite that was associated with the Port River Expressway Project. In accordance with the protection measures for the worksite, train 4A13N had been stopped by a flagman about 130 m from the level crossing. When all personnel and equipment were clear of the track, train 4A13N was given permission to proceed into the worksite and over the Stirling Street level crossing. Several witnesses confirmed that, at this time, the locomotive horn was sounded several times and that the locomotive headlight was illuminated.

Shortly after, the train driver made an emergency application of the train brake when he realised that there was a collision risk at the level crossing with an approaching road-train. Train 4A13N collided with the lead trailer of the road-train almost at the centre of the pneumatic cement tank. The impact speed of both the train and road-train was low (about 15 km/h) but nevertheless sufficient to roll the prime mover and the leading trailer onto their sides and to derail the lead bogie of the train’s locomotive.

While evidence in regard to the sequence of events in the moments before the collision varies considerably, the investigation concluded that it is likely the road-train did not stop at the Stop sign assembly and travelled over the Stirling Street level crossing at a relatively constant speed of about 15 km/h into the path of train 4A13N. It is very unlikely that the road-train driver stopped at the Stop sign assembly, but if he did, he displayed poor judgement in electing to accelerate normally from a position that was effectively blind to oncoming rail traffic.

The investigation found that the double trailer road-train did not have a Heavy Vehicle Permit (HVP) to operate on Stirling Street at the time of the collision. As such, the owner and driver of the double trailer road-train did not hold any authority to operate this vehicle over the Stirling Street level crossing. In addition, the ARTC had not recently been approached to issue clearances for other level crossings in SA by either the permit applicant or the Department for Transport Energy and Infrastructure when HVP’s were issued for ‘fixed-term’ operations.

The investigation also found that the Stop sign assembly had been moved from its original position (3.5 m from the rail line) to its position at the time of the occurrence (9.1 m from the rail line) sometime during the upgrade of the level crossing. Similarly, the Stop line (pavement marking) had either not been reinstated or not maintained in a serviceable condition after road resurfacing. In the absence of a visible Stop line, the sight distance along the rail line from the Stop sign assembly was inadequate when assessed against the Australian Standard. While inadequate sighting was unlikely to have contributed to this collision, it was still considered a safety issue with respect to road traffic that obeyed the road rules and stopped as required.

Safety issues identified by the investigation relate to the compliance of the level crossing to the relevant standard, notification to rail infrastructure management of non-compliances identified at audit and the issuing of HVP’s for routes that involve level crossings. The ATSB has acknowledged proactive safety action taken by relevant parties in response to those identified safety issues. In addition, the ATSB has issued four safety recommendations.

Safety issues

Lack of Interface Agreement, Stirling Street Level Crossing

Organisation: Port Adelaide Enfield City Council

Safety issue description: At the time of the collision, the Australian Rail Track Corporation and the Port Adelaide Enfield Council did not have an interface coordination plan to manage the risks associated with the Stirling Street level crossing interface, including the installation and maintenance of pavement marking.

Safety recommendation

Recommendation number: RO-2008-001-SR-021

Published date: 30/09/2009

Status: Closed - Partial Action

Safety recommendation description: The Australian Transport Safety Bureau recommends that the Port Adelaide Enfield City Council takes action to address this safety issue.

Organisation response: Received 15/03/2010

The Port Adelaide Enfield City Council has advised that the recommendation is accepted. The Council is awaiting the drafting of Interface Agreements by the SA State Level Crossing Advisory Committee. Also, the Council has advised that they are currently working with the Department of Transport, Energy and Infrastructure's (DTEI) Level Crossing Unit in relation to DTEI's survey and assessment of level crossings in SA.

ATSB response

After monitoring the response to the recommendations issued to the ARTC and the Port Adelaide Enfield City Council for 12 months, the latest advice received from the relevant SA Department is that it is anticipated that a Bill amending the SA Rail Safety Act 2007 that will mandate Level Crossing Interface Agreements between the rail track owner and the relevant road authority will be enacted during 2011. Given that both the ARTC and the Port Adelaide Enfield City Council have agreed to the recommendations and because the ramifications pertaining to level crossings are State-wide rather than any given level crossing, the ATSB considers that the matter is being dealt with at the appropriate level.

ARTC response to recommendation for level crossing interface agreement

Organisation: Australian Rail Track Corporation

Safety issue description: At the time of the collision, the Australian Rail Track Corporation and the Port Adelaide Enfield Council did not have an interface coordination plan to manage the risks associated with the Stirling Street level crossing interface, including the installation and maintenance of pavement marking.

Safety recommendation

Recommendation number: RO-2008-001-SR-025

Published date: 30/09/2009

Status: Closed - Partial Action

Safety recommendation description: The Australian Transport Safety Bureau recommends that the Australian Rail Track Corporation takes action to address this safety issue.

Organisation Response: Received 06/01/2010

The ARTC accepts the above recommendation. The ARTC has been working towards establishing an interface agreement with the SA Department for Transport, Energy and Infrastructure for several years. It is anticipated that once a model agreement is established negotiations  with Local Government agencies will progress at a significantly faster rate.

Negotiations with Local Government organisations if not progressed as a block via the Local Government Association will need to be progressed by individual negotiation with each interfacing Council.

If the latter situation is the case ARTC reserves the right to prioritise negotiations based on a number of interfaces and perceived risk to the safety of rail operations.

ATSB Response: 11/11/2010

After monitoring the response to the recommendations issued to the ARTC and the Port Adelaide Enfield City Council for 12 months, the latest advice received from the relevant SA Department is that it is anticipated that a Bill amending the SA Rail Safety Act 2007 that will mandate Level Crossing Interface Agreements between the rail track owner and the relevant road authority will be enacted during 2011. Given that both the ARTC and the Port Adelaide Enfield City Council have agreed to the recommendations and because the ramifications pertaining to level crossings are State-wide rather than any given level crossing, the ATSB considers that the matter is being dealt with at the appropriate level.

Occurrence summary

Investigation number RO-2008-001
Occurrence date 05/03/2008
Location Birkenhead
State South Australia
Report release date 06/10/2009
Report status Final
Investigation level Systemic
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Rail
Rail occurrence category Level Crossing
Occurrence class Accident
Highest injury level None

Train details

Train number Train 4A13
Type of operation Freight Train
Train damage Minor