Level Crossing Collision, Two Wells, South Australia, on 6 August 2007

RO-2007-005

Final report

Report release date: 20/08/2008

Executive summary

On Monday 6 August 2007 at approximately 11351, a truck carrying sewage on the Two Wells – Mallala Road, South Australia, turned right into a private road level crossing. The truck driver stopped and changed gear before proceeding up a grade and over the railway line where the truck was struck by The Ghan passenger train (7DA8). The Ghan was en route to Adelaide after leaving Darwin two days earlier and was travelling at 93 km/h at the time of the collision.

The truck driver was seriously injured and the truck was destroyed. The train driver was not injured but two passengers on the train reported minor injuries. The train’s lead locomotive suffered extensive damage to structural and non-structural frontal components. There was minimal damage to the track.

The level crossing where the accident occurred is located about 3 km north of Two Wells on a private road which provides access to ‘Murrow Farm’. The crossing is categorised as an ‘Occupation’2 crossing and was fitted with ‘Stop’ signs.

The investigation found that the truck driver had not stopped at the ‘Stop’ sign at the level crossing but even if he had, thick vegetation growing beside the road meant that it was not possible for him to adequately sight the approaching train to allow his safe passage across the railway line at the entrance to Murrow Farm. In addition, the following factors contributed to the collision:

  • Maintenance practices for the control of vegetation in the rail corridor at the Murrow Farm level crossing were inadequate.
  • Tree pruning and clearing works following the identification of a sighting hazard at the Murrow Farm level crossing in March 2007 were not completed within 28 days in accordance with the original assessment and priority maintenance specification.
  • The Australian Rail Track Corporation (ARTC) Infrastructure Management System priority rating for the sighting restoration work at the Murrow Farm level crossing was revised from 28 days to 180 days. A reassessment of the status of vegetation at the level crossing and its effect on sighting distances was not undertaken before the priority rating was changed.
  • For drivers entering Murrow Farm, the railway ‘Stop’ sign assembly (RX-2 modified) was approximately 4.6 m from the nearest rail. Although Australian Standard AS 1742.7, recommends sign assemblies should not be placed closer than 3.5 m from the nearest rail, positioning the sign nearer to the 3.5 m point would have assisted the driver in gaining a clearer view of approaching trains.

The report issues six recommendations to address the safety issues identified and acknowledges one safety action already taken by the ARTC.

________________________________________

  1. Central Standard Time.
  2. An occupation crossing is ‘a privately accessible crossing of a track by a roadway at the same or intersecting elevation’. (Glossary for National Code of Practice and Dictionary of Railway Terminolgy-17/06/2004)

Occurrence summary

Investigation number RO-2007-005
Occurrence date 06/08/2007
Location Two Wells
State South Australia
Report release date 20/08/2008
Report status Final
Investigation level Systemic
Investigation type Occurrence Investigation
Investigation status Completed
Mode of transport Rail
Rail occurrence category Level Crossing
Occurrence class Accident
Highest injury level Serious

Train details

Train number Train 7DA8
Type of operation Passenger Train
Departure point Darwin, Northern Territory
Destination Adelaide, South Australia
Train damage Substantial