|
Safety Issue
A single extra pulse echo was recorded during the last
ultrasonic inspection of the rail, nine months before the
derailment, in the vicinity of the failure. An examination with
handheld ultrasonic testing equipment at the time concluded there
was no sizable defect in the rail, even though the evidence
suggests that the fatigue cracks existed (to some degree) at the
time.
Safety Recommendation
The Australian Transport Safety Bureau recommends that the ARTC
take action to address this safety issue.
|