Jump to Content

Boundary fence

Issue number: RO-2013-023-SI-01
Who it affects: All local councils and track managers
Issue owner: The Australian Rail Track Corporation / Golden Plains Shire
Operation affected: Rail: Infrastructure
Background: Investigation Report RO-2013-023
Date: 05 February 2014

Safety issue description

The boundary fence between the railway maintenance access track and Gallagher Road had been removed. As a result, over time and with regular use, the false perception that the maintenance access track was part of Gallagher Road was created and reinforced.

Proactive Action

Action organisation: Australian Rail Track Corporation
Action number: RO-2013-023-NSA-25
Date: 05 February 2014
Action status: Closed

The Australian Rail Track Corporation will commit to work with the Golden Plains Shire Council, as the relevant road authority and adjoining land owner to achieve the permanent closure of the section of Gallagher Road, which is located on the rail corridor. The safe and permanent closure of the roadway at the surveyed boundary requires signage to be installed on the main part of Gallagher Road; hence the safe and effective permanent closure is seen to be a joint project.

ATSB response:

The ATSB is satisfied that the actions proposed by the Australian Rail Track Corporation, in combination with Golden Plains Shire, will adequately address this safety issue.

Proactive Action

Action organisation: Golden Plains Shire
Action number: RO-2013-023-NSA-26
Date: 05 February 2014
Action status: Closed

The Golden Plains Shire Council has recently updated its Road Management Plan and intends to revise its Register of Public Roads for the purpose of clarifying the status of roads currently classed as Unmade Roads. The revision will result in roads currently included on the register as a public road and classed as an unmade road, being removed from the register. The council will jointly work with the ARTC to isolate the rail reserve from the road reservation.

ATSB response:

The ATSB is satisfied that the actions taken and proposed by Golden Plains Shire, in combination with the Australian Rail Track Corporation, will adequately address this safety issue.

   
Current issue status: Adequately addressed
Status justification:

The Australian Rail Track Corporation and the Golden Plains Shire have advised that they will work together to permanently isolate the rail corridor from Gallagher Road.

 
Share this page Comment
Last update 25 February 2015