Jump to Content
Download final report
[ Download PDF: 1.37MB]
 
 
 

What happened

At about 1009 on 31 August 2013, passenger train 7MA8, known as ‘The Overland’, was travelling from Melbourne to Adelaide when it collided with a Holden Rodeo dual cab utility on the Mahers Road level crossing at Inverleigh, Victoria.

The sole occupant of the utility was seriously injured and transferred to Royal Melbourne Hospital. The locomotive crew suffered from shock, but none of the train’s 103 passengers were injured.

What the ATSB found

The ATSB’s investigation found that the driver of the utility was travelling along a maintenance access track adjacent to the railway before he turned into Mahers Road. As a result, he was provided with no warning of the approaching train.

The investigation also found that, at some time in the past, the railway property boundary fence had been removed, thereby providing local vehicle access along the railway maintenance track. As a result, over time and with regular use, the false perception that the maintenance track was part of Gallagher Road was created and reinforced.

Since the maintenance access track was not a public road, neither the ARTC nor the Golden Plains Shire had identified a need to provide traffic control.

What's been done as a result

The Australian Rail Track Corporation and the Golden Plains Shire have advised that they will work together to permanently isolate the rail corridor from Gallagher Road.

Safety message

This incident highlights the need for road and rail authorities to work together in maintaining the integrity of fences and structures used to exclude public access to the railway corridor.

The occurrence also highlights the need for drivers of motor vehicles to be vigilant at railway level crossings.

Download final report
[ Download PDF: 1.37MB]
 
 
 
 
 
 

To download an image click the download link then right-click the image and select save image as.

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you want to use their material you will need to contact them directly.

 

Safety issue

RO-2013-023-SI-01 -  

Boundary fence

The boundary fence between the railway maintenance access track and Gallagher Road had been removed. As a result, over time and with regular use, the false perception that the maintenance access track was part of Gallagher Road was created and reinforced.

Safety issue details
Issue number:RO-2013-023-SI-01
Who it affects:All local councils and track managers
Status:Adequately addressed

 
General details
Date: 31 August 2013 Investigation status: Completed 
Time: 1009 EST Investigation type: Occurrence Investigation 
Location   (show map):Mahers Road, Inverleigh  
State: Victoria  
Release date: 05 February 2014 Occurrence category: Accident 
Report status: Final Highest injury level: Serious 
 
Train details
Line operator: Australian Rail Track Corporation 
Train operator: Great Southern Rail 
Train registration: 7MA8 
Type of operation: Passenger 
Sector: Passenger - regional 
Damage to train: Minor 
Departure point:Melbourne,Vic.
Destination:Adelaide, SA
 
 
 
Share this page Provide feedback on this investigation
Last update 25 February 2015