Rail safety issues and actions

Train handling

Issue number: RO-2010-001-SI-02
Who it affects: All rolling stock operators
Issue owner: Pacific National Pty Ltd
Transport function: Rail: Freight
Background: Investigation Report RO-2010-001
Issue release date: 04 July 2011
Current issue status: Adequately addressed
Issue status justification:

The train crew were unaware of the speed restriction, as were Pacific National generally. It was accepted that class F wagons were restricted to a maximum speed of 80km/h, without any caveats on operation. Pacific National management will now monitor conformance of train handling by train crews and speed limitations placed on rolling stock. The ATSB accepts Pacific National's response to operate these wagons within specified speed limits and now believes that there is a minor risk of recurrence.

Safety issue description

All limestone bulk hopper wagons have been operated up to 15 km/h higher than speeds specified in the Train Operating Conditions Manual, when loaded above 92 t and operated on class 1 or 1C track.

Proactive Action

Action number: RO-2010-001-NSA-009
Action organisation: Pacific National Pty Ltd
Date: 04 July 2011
Action status: Closed

On completion of our internal report a depot action plan was immediately initiated to alert all train crew of their obligation to ensure these services do not exceed appropriate speed.

Further to the initial notification to train crew post the incident, the management team continue to monitor the conformance of train running for the said services.

ATSB comment:

The ATSB is satisfied that the action taken by Pacific National adequately addresses the safety issue.

Last update 21 February 2014