Marine safety investigations & reports

Independent investigation into the engine room fire on board the Australian registered bulk carrier River Embley off Gladstone, Queensland, on 16 February 2010

Investigation number:
272-MO-2010-001
Status: Completed
Investigation completed

Summary

Download Final Report
[Download  PDF: 3.24MB]
 

At 0435 on 16 February 2010, the bulk carrier River Embley was at anchor off Gladstone, Queensland, when the ship's fire alarms sounded, alerting the crew to an engine room fire. A few minutes later, while the engineers were investigating the fire, there was an explosion in the engine room.

The crew shut down the running machinery, the engine room vents were closed and the ship's electrical load was transferred to the emergency generator. They monitored the situation and at 0823 confirmed that the fire had been extinguished. By 1105, they had determined that the engine room was safe to enter without the use of breathing apparatus.

The ATSB investigation determined that the fire started inside a screw type air compressor and that the explosion that followed occurred when a cloud of hot oil vapour, which had been expelled from the compressor, ignited.

The investigation found that the compressor did not shut down before the fire occurred because its high temperature alarm/shutdown did not operate. The investigation also found that, during the emergency response, the crew worked as a team and demonstrated how effective a trained response to an unexpected emergency can be.

The investigation identified two safety issues: routine testing of the compressor high temperature alarm/shutdown was not included in the ship's planned maintenance system; and routine testing of the alarm/shutdown was not included in the manufacturer's maintenance manual.

These safety issues have been addressed by the ship's managers and the compressor manufacturer.

Download Final Report
[Download  PDF: 3.24MB]
 
 
 

Photos

To download, click the link, then right-click and select Save As.

Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations and should be credited accordingly.

Safety Issues

Go to MO-2010-001-SI-01 - Go to MO-2010-001-SI-02 -

Planned maintenance system alarm/shutdown testing

River Embley’s planned maintenance system did not require routine testing of the compressor high temperature alarm/shutdown.

Safety issue details
Issue number: MO-2010-001-SI-01
Who it affects: All ship owners, operators, managers and engineers
Status: Adequately addressed

Manufacturers guidance

The manufacturer’s maintenance manual did not include a requirement for the routine testing of the compressor high temperature alarm/shutdown.

Safety issue details
Issue number: MO-2010-001-SI-02
Who it affects: All machinery and equipment suppliers
Status: Adequately addressed
General details
Date: 16 February 2010   Investigation status: Completed  
Time: 0435 (UTC +10)   Investigation level: Complex - click for an explanation of investigation levels  
Location   (show map): Gladstone anchorage    
State: Queensland    
Release date: 25 January 2011   Occurrence category: Incident  
Report status: Final   Highest injury level: Minor  

Vessel details

Vessel details
Vessel River Embley  
Flag Australia  
IMO 8018144  
Type of operation Dry bulk carrier  
Damage to vessel Minor  
Departure point Weipa, QLD  
Destination Gladstone, QLD  
Last update 14 November 2018