Safety issue description

Although the Australian Rail Track Corporation was not resourced to actively participate in the design or commissioning phases of the Cootamundra re-signalling project, greater involvement by the Australian Rail Track Corporation (local knowledge of site geography and layout) during these phases may have assisted the South Improvement Alliance engineers in detecting the design error.

Safety Advisory Notice

Action organisation: ARTC
Action number: RO-2009-009-SAN-026
Date: 20 January 2011
Action status: Closed

The Australian Transport Safety Bureau advises that the Australian Rail Track Corporation should consider the implications of this safety issue and take action where considered appropriate.

ATSB response:

ATSB safety advisory notice RO-2009-009-SAN-026 to ARTC to consider action required

Correspondence

Date received: 08 January 2016
Response from: ARTC's rejection of RO-2009-009-SAN-026 examined and accepted by ITSR
Response text:

ITSR notes ARTC's advice on the recommendation.

ITSR have applied a status of recommendation R0-2009-009-SAN-026 is "Closed - Recommendation Rejected".

   
Current issue status: Not addressed
Status justification:

ATSB safety advisory notice RO-2009-009-SAN-026 to ARTC to consider action required

 