Rail safety investigations & reports

Shunting Accident

Investigation number:
2005003
Status: Completed
Investigation completed

Summary

Download Final Report
[Download  PDF: 3.04MB]
 

At approximately 1317 Central Standard Time on Wednesday 2 February 2005, a Specialised Container Transport (SCT) employee was seriously injured whilst undertaking shunting operations at the SCT Rail Yards, Regency Park, South Australia.

The investigation found that work procedures allowed a shunter to ride on the end step of a wagon while being shunted and did not require that the driver confirm that the shunter was safe and/or in a safe position before starting a shunt movement.

The report proposes eight recommendations to improve railway operational safety.

Download Final Report
[Download  PDF: 3.04MB]
 
 
 
General details
Date: 02 February 2005   Investigation status: Completed  
Time: CSuT    
Location: Regency Park    
State: South Australia    
Release date: 31 March 2006    
Report status: Final   Occurrence category: Accident  
  Highest injury level: Serious  

Train details

Train details
Train registration T345  
Type of operation Shunting  
Damage to train Nil  
 
Injuries
  Crew Passenger Ground Total
Serious: 1 0 0 1
Total: 1 0 0 1
Last update 23 November 2010